My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PJ <br />t <br />i <br />3.02 GRADING <br />A. The Contractor shall establish finished grades as shown on the Engineers grading plans <br />and Landscape Architects Aesthetic Grading Plans, and as directed by Landscape <br />Architect and /or Owner's Representative, including areas where the existing grade has <br />been disturbed by other work. <br />B. Finished grading shall be smooth, aesthetically pleasing, drain well and ready to receive <br />sod and other plant material to full satisfaction of Landscape Architect and Owner's <br />Representative. <br />3.03 COMPACTION <br />A. Compact each layer of fill in designated areas with approved equipment to achieve a <br />minimum 90% standard proctor density for the foundation, bedding, haunching, and <br />initial backfill, and a minimum of 85% standard proctor density for the final backfill <br />maximum density at optimum moisture. <br />Under landscaped area, compaction shall not exceed 85% of maximum density. <br />B. No backfill shall be placed against any masonry or other exposed building surface until <br />permission has been given by the Owner's Representative, and in no case until the <br />masonry has been in place seven days. <br />C. Compaction in limited areas shall be obtained by the use of mechanical tampers or <br />approved hand tampers. When hand tampers are used, the materials shall be deposited in <br />layers not more than four inches thick. The hand tampers used shall be suitable for this <br />purpose and shall have a face area of not more than 100 square inches. Special <br />precautions shall be taken to prevent any wedging action against masonry, or other <br />exposed building surfaces. <br />3.04 CORRECTION OF GRADE <br />A. Bring to required grade levels areas where settlement, erosion or other grade changes <br />occur. Adjust grades as required to carry drainage away from buildings and to prevent <br />ponding around the buildings and on pavements. <br />B. Remove all rock or objectionable material larger than 1 inch any direction prior to <br />commencing landscaping. <br />C. Contractor shall be responsible for stabilizing grades by approved methods prior to <br />landscaping, and shall be responsible for correction of grades as mentioned above, and <br />cleanup of any wash outs or erosion. <br />END OF SECTION <br />1 06105 02210 -3 03- 4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.