Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />t <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />PART 3 - EXECUTION <br />3.01 PREPARATION <br />A. All new installation shall be laid out by the contractor in accordance with the construction <br />plans. <br />3.02 INSTALLATION <br />A. Fence posts shall be set in accordance with the spacings shown in Table 2, plus or minus <br />1/2 ", depending on the nominal span specified. <br />Span T­­ 6 Nominal (73 -1/4" Rail) 8' Nominal (92" Rail) <br />Post Size - 1/2��.._....._._ _ f3�� .... . ....... ___. I2 -1/2" 3 <br />Post Settings t' /z O.C. 176 -3/4" 77 -1/4" !95 -1/2" 96" <br />.. ............ . ....... .. ..__... <br />Table 2 — Post Spacing Requirements <br />Gate posts shall be spaced according to the gate openings specified in the construction <br />plans. The "Earthwork" and "Concrete" sections of this specification shall govern post <br />base material requirements. Aegis PlusTM panels shall be attached to posts using <br />mechanically fastened panel brackets supplied by the manufacturer. <br />3.03 CLEANING <br />A. The contractor shall clean the jobsite of excess materials; post -hole excavations shall be <br />scattered uniformly away from posts. <br />06/05 <br />END OF SECTION <br />02444 -4 <br />03- 4138.B <br />