My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />PART 3 - EXECUTION <br />3.01 INSPECTIONS <br />A. Examine areas to receive soil preparation to assure work of other trades has been <br />completed. <br />B. Verify that plants to remain undisturbed have been clearly identified and protected from <br />injury during construction. If not, identify and protect plants to remain according to <br />procedures set forth in Section 02490 - Trees, Plants and Groundcover. Refer to <br />Protective Fencing on plans. <br />C. Remove all construction materials and debris from all areas to be landscaped, without <br />additional expense to Owner, prior to subsoil preparation. <br />D. Do not proceed with soil preparation until all unsatisfactory conditions are corrected. <br />3.02 SITE PREPARATION <br />A. General: Within the entire area to be landscaped as shown on the drawings, the <br />contractor shall complete the following site topsoil preparation items to eradicate all <br />existing weed and /or natural groundcover. Initiate site topsoil preparation as stated <br />herein and coordinate all work with the existing underground sprinkler system and <br />electrical lines. <br />B. Post Emergence Herbicide: Apply "Roundup" as manufactured by Monsanto Corp. <br />according to manufacturer's recommended rate and specification within the limits of all <br />areas to be landscaped not specified as existing, to be relocated, or to be removed. <br />Protect existing plants from overspray. <br />C. Pre - Emergence Herbicide: Apply "Ron- Star" or approved equal to all areas to be <br />landscaped according to the manufacturer's recommended rate and specification. <br />Contractor shall be responsible to re -apply appropriate herbicide to eradicate all <br />remaining weeds and maintain a weed -free condition in all areas throughout all <br />landscape planting operations. <br />3.03 PERFORMANCE <br />A. Subsoil: Remove all debris, gravel, rocks and other deleterious material over 2 inches in <br />diameter, within 12 inches of surface in areas to receive topsoil mixture, from the project <br />site. Fine grade subsoil to assure finish grades are achieved by adding the specified <br />depth of topsoil mixture. <br />B. Soil mixtures: <br />Remove rocks and other objects over 1 inch diameter. <br />2. Smooth soil mixtures to four (4) inches below top of surrounding paving, <br />wherever planting beds abut paved surfaces. <br />3. Do not compact planting soil mixture, but do wet -soak planting areas to assure <br />proper settlement. Replace topsoil /planting soil mixture to specified grade after <br />watering, where necessary. <br />1 06/05 02484 -5 03- 4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.