My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:36:16 AM
Creation date
1/19/2011 10:18:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.08.A. The OWNER will secure and pay for only the following governmental charges and inspection <br />fees: <br />a. special assessments, <br />b. capital connection fees, <br />' c. threshold and special inspection fees, <br />d. permanent utility meter installation fees, <br />e. permanent utility hook -up fees, and <br />1 f. impact fees. <br />6.08.13. CONTRACTOR shall pay for all building permits and charges of utility owners for connections <br />to the Work, and OWNER will pay charges of such utility owners for capital costs related thereto such as <br />plant investment fees. <br />Delete the last sentence of Paragraph 6.12. and substitute the following: "These shall be available to <br />ENGINEER for examination during construction and shall be delivered "to ENGINEER for OWNER <br />upon Substantial Completion of the Work." <br />r-, <br />L <br />1 <br />At the end of Paragraph 6.13.13, add the following sentences: "The Occupational Safety and Health <br />Administration excavation safety standards, 29 CFR 1926.650 Subpart P trench safety standards are in <br />effect during the period of construction of the Project. In compliance with current State of Florida <br />statutes, the Contractor or subcontractor performing trench excavation work on the Project shall comply <br />with the applicable trench safety standards." <br />In the sixth line of Paragraph 6.20.A., change the parenthetical insert to read as follows: "...(including but <br />not limited to fees and charges of ENGINEER, other engineers, architects, attorneys and other <br />professionals, particularly including, but not limited to reasonable ENGINEER's attorney's fees, and court <br />costs) ". <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br />Change the first sentence of Paragraph 9.01.A. to read as follows: "If OWNER and ENGINEER agree, <br />ENGINEER will be OWNER's representative during the construction period." <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS <br />Add the following: <br />10.06. Without invalidating the agreement, Owner may, at any time execute appropriate Change Orders <br />for additions and/or deletions in the work of up to 25% of the total contract amount, without a change in <br />the contract unit prices bid. <br />ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR <br />ACCEPTANCE OF DEFECTIVE WORK <br />13.03. TEST AND INSPECTIONS: <br />Replace 13.03.13. with "All testing shall be paid for by the Contractor." <br />Add the following sentence to Paragraph 13.07.A.: "Specific and special warranties specified in the <br />Contract Documents are in addition to, and not in lieu of, the contractors general warranty. <br />06/05 00800 -5 03- 4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.