Laserfiche WebLink
Median Fencing Improvements <br />UNIT PRICE BID SCHEDULE <br />Item Estimated <br />No. Description Quantity Unit Unit Price Estimated Amount <br />I. FENCING <br />I Furnish and Install Three -Foot (3') High Black <br />Metal Picket Fence. <br />2 Repair /Reset Three -Foot (3') High Black Metal <br />Picket Fence. <br />3 Furnish and Install Six -Foot (6') High Black <br />Metal Picket Fence. (Future Installation) <br />4 Furnish and Install Eight -Foot (8') High Black <br />Metal Picket Fence. (Future Installation) <br />SUBTOTAL FENCING <br />II. GENERAL <br />5 Maintenance of Traffic <br />6 Mobilization and Demobilization of all <br />equipment and personnel (10% of Subtotal) <br />7 Contingency (10% of Subtotal) <br />SUBTOTAL GENERAL <br />GRAND TOTAL (Items 1 -7) <br />(Authorized Signature) <br />1,175 <br />16 <br />500 <br />500 <br />LF $ '�o.00 $ S O.oa <br />LF $ <br />\od•oe <br />$ <br />6 ca. oo <br />LF $ <br />�5�00 <br />$ <br />Sac) Z, <br />LF $ <br />—1 °• "O <br />$ <br />3 5 40 ®.o a <br />$ 1 5 3 'D <br />1 LS $ 5 000 $ 5 mm <br />1 LS $ \y 000 $ 0 l <br />1 LS $ \ %000 $ \ $Jo®O.On <br />$ 4 1 ©oo.an <br />(Written) / <br />s If— � 11!!� l` <br />A.• C <br />$ \°k83`Jo.o0 <br />(Date) <br />06/05 00300 -2 03-4138.B <br />wZ <br />