My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tenex Enterprises Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Tenex Enterprises Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 10:20:42 PM
Creation date
1/19/2011 10:29:41 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />2. CONTRACTOR shall not be entitled to any <br />adjustment in the Contract Price or Contract Times if: <br />a. CONTRACTOR knew of the existence of <br />such conditions at the time CONTRACTOR made a <br />final commitment to OWNER in respect of Contract <br />Price and Contract Times by the submission of a Bid <br />or becoming bound under a negotiated contract; or <br />b. the existence of such condition could <br />reasonably have been discovered or revealed as a <br />result of any examination, investigation, exploration, <br />test, or study of the Site and contiguous areas <br />required by the Bidding Requirements or Contract <br />Documents to be conducted by or for CON- <br />TRACTOR prior to CONTRACTOR's making such <br />final commitment; or <br />c. CONTRACTOR failed to give the written <br />notice within the time and as required by paragraph <br />4.03.A. <br />3. If OWNER and CONTRACTOR are unable to <br />agree on entitlement to or on the amount or extent, if any, <br />of any adjustment in the Contract Price or Contract <br />Times, or both, a Claim may be made therefor as <br />provided in paragraph 10.05. However, OWNER, <br />ENGINEER, and ENGINEER's Consultants shall not be <br />liable to CONTRACTOR for any claims, costs, losses, or <br />damages (including but not limited to all fees and charges <br />of engineers, architects, attorneys, and other professionals <br />and all court or arbitration or other dispute resolution <br />costs) sustained by CONTRACTOR on or in connection <br />with any other project or anticipated project. <br />' 4.04 Underground Facilities <br />A. Shown or Indicated: The information and data shown <br />or indicated in the Contract Documents with respect . to <br />existing Underground Facilities at or contiguous to the Site <br />is based on information and data furnished to OWNER or <br />ENGINEER by the owners of such Underground Facilities, <br />including OWNER, or by others. Unless it is .otherwise <br />expressly provided in the Supplementary Conditions: <br />1. OWNER and ENGINEER shall not be <br />responsible for the accuracy or completeness of any such <br />information or data; and <br />2. the cost of all of the following will be included in <br />the Contract Price, and CONTRACTOR shall have full <br />responsibility for: <br />a. reviewing and checking all such information <br />and data, <br />b. locating all Underground Facilities shown or <br />indicated in the Contract Documents, <br />c. coordination of the Work with the owners of <br />such Underground Facilities, including OWNER, <br />during construction, and <br />d. the safety and protection of all such Under- <br />ground Facilities and repairing any damage thereto <br />resulting from the Work. <br />B. Not Shown or Indicated <br />1. If an Underground Facility is uncovered or <br />revealed at or contiguous to the Site which was not shown <br />or indicated, or not shown or indicated with reasonable <br />accuracy in the Contract Documents, CONTRACTOR <br />shall, promptly after becoming aware thereof and before <br />further disturbing conditions affected thereby or <br />performing any Work in connection therewith (except in <br />an emergency as required by paragraph 6.16.A), identify <br />the owner of such Underground Facility and give written <br />notice to that owner and to OWNER and ENGINEER. <br />ENGINEER will promptly review the Underground <br />Facility and determine the extent, if any, to which a <br />change is required in the Contract Documents to reflect <br />and document the consequences of the existence or <br />location of the Underground Facility. During such time, <br />CONTRACTOR shall be responsible for the safety and <br />protection of such Underground Facility. <br />2. If ENGINEER concludes that a change in the <br />Contract Documents is required, a Work Change <br />Directive or a Change Order will be issued to reflect and <br />document such consequences. An equitable adjustment <br />shall be made in the Contract Price of Contact Times, or <br />both, to the extent that they are attributable to the <br />existence or location . of any Underground Facility that <br />was not shown or- indicated or not shown or indicated <br />.with reasonable accuracy in the Contract Documents and <br />that CONTRACTOR did not know of and could not <br />reasonably have been expected to be aware of or to have <br />anticipated. If OWNER and CONTRACTOR are unable <br />to agree on entitlement to or on the amount or extent, if <br />any, of any such adjustment in Contract Price or Contract <br />Times, OWNER or CONTRACTOR may make a Claim <br />therefor as provided in paragraph 10.05. <br />4.05 Reference Points <br />- A. OWNER shall provide engineering surveys to <br />establish reference points for construction which in <br />EN &INEER's judgment are necessary to enable CON- <br />TRACTOR to proceed with the Work. CONTRACTOR <br />shall be responsible for laying out the Work, shall protect and <br />preserve the established reference points and property <br />00700- 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.