Laserfiche WebLink
1 <br />Ll <br />Change Directives, Field Orders, and written interpretations <br />and clarifications in good order and annotated to show <br />changes made during construction. These record documents <br />together with all approved Samples and a counterpart of all <br />approved Shop Drawings will be available to ENGINEER for <br />reference. Upon completion of the Work, these record <br />documents, Samples, and Shop Drawings will be delivered to <br />ENGINEER for OWNER. <br />6.13 Safety and Protection <br />A. CONTRACTOR shall be solely responsible for <br />initiating, maintaining and supervising all safety precautions <br />and programs in connection with the Work. CONTRACTOR <br />shall take all necessary precautions for the safety of, and <br />shall provide the necessary protection to prevent damage, <br />injury or loss to: <br />1. all persons on the Site or who may be affected <br />by the Work; <br />2. all the Work and materials and equipment to be <br />incorporated therein, whether in storage on or off the <br />Site; and <br />' 3. other property at the Site or adjacent thereto, <br />including trees, shrubs, lawns, walks, pavements, <br />roadways, structures, utilities, and Underground Facilities <br />' not designated for removal, relocation, or replacement in <br />the course of construction. <br />B. CONTRACTOR shall comply with all applicable <br />Laws and Regulations relating to the safety of persons or <br />property, or to the protection of persons or property from <br />damage, injury, or loss; and shall erect and maintain all <br />necessary safeguards for such safety and protection. <br />CONTRACTOR shall notify owners of adjacent property and <br />of Underground Facilities and other utility owners when <br />prosecution of the Work may affect them, and shall cooperate <br />with them in the protection, removal, relocation, and <br />replacement of their property. All damage, injury, or loss to <br />any property referred to in paragraph 6.13.A.2 or 6.13.A.3 <br />caused, directly or indirectly, in whole or in part, by CON- <br />TRACTOR, any Subcontractor, Supplier, or any other <br />individual or entity directly or indirectly employed by any of <br />them to perform any of the Work, or anyone for whose acts <br />any of them may be liable, shall be remedied by <br />CONTRACTOR (except damage or loss attributable to the <br />fault of Drawings or Specifications or to the acts or <br />omissions of OWNER or ENGINEER or ENGINEER's Con- <br />sultant, or anyone employed by any of them, or anyone for <br />whose acts any of them may be liable, and not attributable, <br />directly or indirectly, in whole or in part, to the fault or <br />negligence of CONTRACTOR or any Subcontractor, <br />Supplier, or other individual or entity directly or indirectly <br />employed by any of them). CONTRACTOR's duties and <br />responsibilities for safety and for protection of the Work shall <br />continue until such time as all the Work is completed and <br />ENGINEER has issued a notice to OWNER and <br />CONTRACTOR in accordance with paragraph 14.07.13 that <br />the Work is acceptable (except as otherwise expressly <br />provided in connection with Substantial Completion). <br />6.14 Safety Representative <br />A. CONTRACTOR shall designate a qualified and <br />experienced safety representative at the Site whose duties and <br />responsibilities shall be the prevention of accidents and the <br />maintaining and supervising of safety precautions and <br />programs. <br />6.15 Hazard Communication Programs <br />A. CONTRACTOR shall be responsible for coordinating <br />any exchange of material -safety . data sheets or other hazard <br />communication information required to be made available to <br />or exchanged between or among employers at the Site in <br />accordance with Laws or Regulations. <br />6.16 Emergencies <br />A. In emergencies affecting the safety or protection of <br />persons or the Work or property at the Site or adjacent <br />thereto, CONTRACTOR is obligated to act to prevent <br />threatened damage, injury, or loss. CONTRACTOR shall <br />give ENGINEER prompt written notice if CONTRACTOR <br />believes that any significant changes in the Work or <br />variations from the Contract Documents have been caused <br />thereby or are required as a result thereof. If ENGINEER <br />determines that a change in the Contract Documents is <br />required because of the action taken by CONTRACTOR in <br />response to such an emergency, a Work Change Directive or <br />Change Order will be issued. <br />6:17 Shop Drawings and Samples <br />A. CONTRACTOR shall submit Shop Drawings to <br />ENGINEER for review and approval in accordance with the <br />acceptable schedule of Shop Drawings and Sample <br />submittals. All submittals will be identified as ENGINEER <br />may require and in the number of copies specified in the <br />General Requirements. The data shown on the Shop <br />Drawings will be complete with respect to quantities, dimen- <br />sions, specified performance and design criteria, materials, <br />and similar data to show ENGINEER the services, materials, <br />and equipment CONTRACTOR proposes to provide and to <br />enable ENGINEER to review the information for the limited <br />purposes required by paragraph 6.17.E. <br />r <br />B. CONTRACTOR shall also submit Samples to <br />ENGINEER for review and approval in accordance with the <br />acceptable schedule of Shop Drawings and Sample <br />00700 -23 <br />