My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tenex Enterprises Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Tenex Enterprises Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 10:20:42 PM
Creation date
1/19/2011 10:29:41 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' 1.05 HURRICANE PREPAREDNESS PLAN <br />A. Within ten days of the date of Notice to Proceed, the Contractor shall submit to the <br />Engineer and Owner a Hurricane Preparedness Plan. The plan should outline the necessary <br />measures, which the Contractor proposes to perform at no additional cost to the Owner in <br />' case of a hurricane warning. <br />B. In the event of inclement weather or whenever the Engineer shall direct; the Contractor will <br />cause Subcontractors to protect carefully the Work and materials against damage or injury <br />from the weather. If, in the opinion of the Engineer, any portion of Work or materials shall <br />failure on the art of Contractor or an <br />have been damaged or inured by reason of fa p y <br />Subcontractor to so protect the Work, such Work and materials shall be removed and <br />' replaced at the expense of the Contractor. <br />1.06 EQUIPMENT, TESTING & INSPECTION <br />A. Regardless of the number of days specified in the individual sections for the manufacturers <br />representative to be present on the site for inspection and testing, if the equipment fails to <br />perform as specified then the representative shall remain on site until the malfunction is <br />corrected and the Owner received specified days of inspection or testing. <br />' B. The cost for the additional days required shall not be added to the cost of the Owner, but <br />shall be to the account of the Contractor. <br />' PART 2 — PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION <br />F <br />1 <br />1 <br />1 06/05 01030 -2 034138.B <br />