My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-10-01) Central Island Drainage & St. Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:15:06 AM
Creation date
1/19/2011 10:58:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage & St. Improv.
Bid No. (xx-xx-xx)
05-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Subcontractors: <br />The Contractor is as fully responsible to the City for the acts and omissions of his subcontractors <br />and of persons either directly or indirectly employed by said subcontractor, as he is for the acts <br />and omissions of persons directly employed by him. Nothing contained in the Contract <br />Documents shall create any contractual relations between any subcontractor and the City. <br />Final Cleaning -Up <br />Upon completion of the work specified herein and before acceptance and final payment shall be <br />made, the Contractor shall remove from the site all machinery, equipment, surplus and discarded <br />materials and temporary structures. All disposal of materials, rubbish and debris shall be made at <br />a legal disposal site or by other prior approved manner. Material cleared from the site and <br />deposited on adjacent or nearby property will not be considered as having been disposed of <br />satisfactorily. <br />Non - Discrimination in Employment: <br />In accordance with this Proposal, the Contractor agrees to make no discrimination because of <br />race, color, creed or national origin with respect to employment or personnel on this project, and <br />that all persons having the experience and skill necessary to perform the Work shall be afforded <br />equal opportunity of employment for the Work to be performed at the site of this Project. <br />Conflict of Interest Ordinance: <br />The Contractor agrees to abide and be governed by Miami -Dade County Ordinance No. 72 -82 <br />(Conflict of Interest Ordinance), as amended, and the provisions of chapter 330 of the code of the <br />City of Sunny Isles Beach, which is incorporated herein by reference as if fully set forth herein, in <br />connection with its Contract obligations hereunder. <br />Independent Private - Sector Inspector General ( IPSIG): <br />The City shall have the right but not the obligation to retain the services of an independent <br />private- sector inspector general ( IPSIG) who may be engaged to audit, investigate, monitor, <br />oversee, inspect and review the operations, activities and performance of the Contractor and City <br />in connection with this Contract. The scope of services performed by an IPSIG may include, but <br />are not limited to, monitoring and investigating compliance with Contract Specifications; project <br />costs; and investigating and preventing corruption and fraud. <br />The IPSIG may perform its services at all levels of the contracting and procurement process <br />including but not limited to project design, establishment of bid specifications, bid submittals, <br />activities of the Contractor, its officers, agents and employees, lobbyists, city staff and elected <br />officials. <br />Upon (10) ten days written notice to the Contractor from an IPSIG, the Contractor shall make all <br />requested records and documents available to the IPSIG for inspection and copying. The IPSIG <br />shall have the right to examine all documents and records in the Contractor's possession, custody <br />or control which in the IPSIG's sole judgment pertain to performance of the Contract, including <br />but not limited to original estimate files, bid and change order estimates, worksheets, proposals <br />and agreements from and with successful and unsuccessful subcontractors and suppliers, all <br />project - related correspondence, memoranda, instructions, financial documents, construction <br />General Specifications 09/24 Page 14 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.