My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-10-01) Central Island Drainage & St. Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:15:06 AM
Creation date
1/19/2011 10:58:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage & St. Improv.
Bid No. (xx-xx-xx)
05-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />J <br />II <br />i <br />[I <br />of the contract price (with the balance being retainage), less such amounts as ENGINEER <br />shall determine, only after receipt of the final as- builts and upon substantial completion of the <br />project and in accordance with Paragraph 14.02 of the General Conditions. <br />5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with <br />Paragraph 14.07 of the General Conditions, OWNER shall pay the remainder of the Contract Price <br />as recommended by ENGINEER as provided in said Paragraph 14.07. <br />Article 6. INTEREST. (Not Applicable) <br />Article 7. CONTRACTOR'S REPRESENTATIONS. <br />In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following <br />representations: <br />7.1. CONTRACTOR has examined and carefully studied the Contract Documents (including <br />the Addenda listed in Paragraph 8.9) and the other related data identified in the Bidding <br />Documents including "technical data." <br />7.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the <br />general, local and site conditions that may affect cost, progress, performance or furnishing of <br />the Work. <br />7.3. CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and <br />Regulations that may affect cost, progress, performance and furnishing of the Work. <br />7.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface <br />conditions at or contiguous to the site and all drawings of physical conditions in or relating to <br />existing surface or subsurface structures at or contiguous to the site (except Underground <br />Facilities) which have been identified in the Supplementary Conditions as provided in <br />Paragraph 4.2.1. of the General Conditions. CONTRACTOR accepts the determination set <br />forth in Paragraph SC -4.2 of the Supplementary Conditions of the extend of the "technical <br />data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as <br />provided in Paragraph 4.02 B of the General Conditions. CONTRACTOR acknowledges that <br />such reports and drawings are not Contract Documents and may not be complete for <br />CONTRACTOR's purposes. CONTRACTOR acknowledges that OWNER and ENGINEER do not <br />assume responsibility for the accuracy or completeness of information and data shown or <br />indicated in the Contract Documents with respect to Underground Facilities at or contiguous <br />to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br />having done so) all such additional supplementary examinations, investigations, explorations, <br />tests, studies and data concerning conditions (surface, subsurface and Underground <br />Facilities) at or contiguous to the site or otherwise which may affect cost, progress, <br />performance or furnishing of the Work or which relate to any aspect of the means, methods, <br />techniques, sequences and procedures of construction to be employed by CONTRACTOR and <br />safety precautions and programs incident thereto. CONTRACTOR does not consider that any <br />additional examinations, investigations, explorations, tests, studies or data are necessary for <br />the performance and furnishing of the Work at the contract Price, within the Contract Times <br />and in accordance with the other terms and conditions of the Contract Documents. <br />7.5. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />others at the site that relates to the Work as indicated in the Contract Documents. <br />7.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the site, reports and drawings identified in the Contract <br />Documents and all additional examinations, investigations, explorations, tests, studies and <br />data with the Contract Documents. <br />IEJCDC STANDARD FORM OF AGREEMENT 09/24 00500 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.