Laserfiche WebLink
iJ <br />pursuant to paragraph 14.04, or after frial payment <br />pursuant to paragraph 14.07. <br />C. Any insurance policy maintained by OWNER cover- <br />ing any loss, damage or consequential loss referred to in <br />paragraph 5.07.13 shall contain provisions to the effect that in <br />the event of payment of any such loss, damage, or <br />consequential loss, the insurers will have no rights of <br />recovery against CONTRACTOR, Subcontractors, <br />ENGINEER, or ENGINEER's Consultants and the officers, <br />directors, partners, employees, agents, and other consultants <br />and subcontractors of each and any of them. <br />5.08 Receipt and Application of Insurance Proceeds <br />A. Any insured loss under the policies of insurance <br />required by paragraph 5.06 will be adjusted with OWNER <br />and made payable to OWNER as fiduciary for the insureds, <br />as their interests may appear, subject to the requirements of <br />any applicable mortgage clause and of paragraph 5.08.B. <br />OWNER shall deposit in a separate account any money so <br />received and shall distribute it in accordance with such agree- <br />ment as the parties in interest may reach. If no other special <br />agreement is reached, the damaged Work shall be repaired or <br />replaced, the moneys so received applied on account thereof, <br />and the Work and the cost thereof covered by an appropriate <br />Change Order or Written Amendment. <br />B. OWNER as fiduciary shall have power to adjust and <br />settle any loss with the insurers unless one of the parties in <br />interest shall object in writing within 15 days after the <br />occurrence of loss to OWNER's exercise of this power. If <br />such objection be made, OWNER as fiduciary shall make <br />settlement with the insurers in accordance with such <br />of such party by the Contract Documents, such party shall <br />notify the other party in writing of such failure to purchase <br />prior to the start of the Work, or of such failure to maintain <br />prior to any change in the required coverage. Without <br />prejudice to any other right or remedy, the other party may <br />elect to obtain equivalent Bonds or insurance to protect such <br />other party's interests at the expense of the party who was <br />required to provide such coverage, and a Change Order shall <br />be issued to adjust the Contract Price accordingly. <br />5.10 Partial Utilization, Acknowledgment of Property <br />Insurer <br />A. If OWNER finds it necessary to occupy or use a <br />portion or portions of the Work prior to Substantial <br />Completion of all the Work as provided in paragraph 14.05, <br />no such use or occupancy shall commence before the insurers <br />providing the property insurance -pursuant to paragraph 5.06 <br />have acknowledged notice thereof and in writing effected any <br />changes in coverage necessitated thereby. The insurers <br />providing the property insurance shall consent by endorse- <br />ment on the policy or policies, but the property insurance <br />shall not be canceled or permitted to lapse on account of any <br />such partial use or occupancy. <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />6.01 Supervision and Superintendence <br />A. CONTRACTOR shall supervise, inspect, and direct <br />the Work competently and efficiently, devoting such attention <br />thereto and applying such skills and expertise as may be <br />with the <br />agreement as the parties in interest may reach. If no such necessary to perform the Work in accordance <br />agreement among the parties in interest is reached, OWNER Contract Documents. CONTRACTOR shall be solely <br />as fiduciary shall adjust and settle the loss with the insurers responsible for the means,.methods, techniques, sequences, <br />and, if required in writing by any party in interest, OWNER and procedures of construction, but CONTRACTOR shall <br />as fiduciary shall give bond for the proper performance of not be responsible: for the negligence of OWNER or <br />such duties. ENGINEER in the design .or. specification of a specific <br />means, method, technique, sequence, or procedure of <br />5.09 Acceptance of Bonds and Insurance; Option to construction which is shown or indicated in and expressly <br />Replace required by the Contract Documents. CONTRACTOR shall <br />be responsible to see that the completed Work complies <br />A. If either OWNER or CONTRACTOR has any <br />objection to the coverage afforded by or other provisions of <br />the Bonds or insurance required to be purchased and <br />maintained by the other party in accordance with Article 5 on <br />the basis of non- conformance with the Contract Documents, <br />the objecting party shall so notify the other parry in writing <br />within 10 days after receipt of the certificates (or other <br />evidence requested) required by paragraph 2.05.C. OWNER <br />and CONTRACTOR shall each provide to the other such <br />additional information in respect of insurance provided as the <br />other may reasonably request. If either party does not <br />purchase or *maintain all of the Bonds and insurance required <br />accurately with the Contract Documents. <br />B. At all times during the progress of the Work, <br />CONTRACTOR shall assign a competent resident superin- <br />tendent thereto who shall not be replaced without written <br />notice to OWNER and ENGINEER except under <br />extraordinary circumstances. The superintendent will be <br />COI)1TRACTOR's representative at the Site and shall have <br />authority to act on behalf of CONTRACTOR. All <br />communications given to or received from the superintendent <br />shall be binding on CONTRACTOR. <br />00700-18 <br />