My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-10-01) Central Island Drainage & St. Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:15:06 AM
Creation date
1/19/2011 10:58:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage & St. Improv.
Bid No. (xx-xx-xx)
05-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 17 - MISCELLANEOUS <br />I17.01 Giving Notice <br />A. Whenever any provision of the Contract Documents <br />requires the giving of written notice, it will be deemed to <br />have been validly given if delivered in person to the <br />individual or to a member of the firm or to an officer of the <br />' corporation for whom it is intended, or if delivered at or sent <br />by registered or certified mail, postage prepaid, to the last <br />business address known to the giver of the notice. <br />' 17.02 Computation of Times <br />A. When any period of time is referred to in the <br />' Contract Documents by days, it will be computed to exclude <br />the first and include the last day of such period. If the last <br />day of any such period falls on a Saturday or Sunday or on <br />a day made a legal holiday by the law of the applicable <br />' jurisdiction, such day will be omitted from the computation. <br />17.03 Cumulative Remedies <br />' A. The duties and obligations imposed by these General <br />Conditions and the rights and remedies available hereunder <br />' to the parties hereto are in addition to, and are not to be <br />construed in any way as a limitation of, any rights and <br />remedies available to any or all of them which are otherwise <br />imposed or available by Laws or Regulations, by special <br />' warranty or guarantee, or by other provisions of the Contract <br />Documents, and the provisions of this paragraph will be as <br />effective as if repeated specifically in the Contract <br />1 Documents in connection with each particular duty, <br />obligation, right, and remedy to which they apply. <br />1 17.04 Survival of Obligations <br />A. All representations, indemnifications, warranties, <br />and guarantees made in, required by, or given in accordance <br />' with the Contract Documents, as well as all continuing <br />obligations indicated in the Contract Documents, will survive <br />final payment, completion, and acceptance of the Work or <br />' termination or completion of the Agreement. <br />17.05 Controlling Law <br />A. This Contract is to be governed by the law of the <br />state in which the Project is located. <br />1 00700 -42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.