Laserfiche WebLink
J <br />r <br />L, <br />Add the following sentence to Paragraph 13.07.A.: <br />"Specific and special warranties specified in the Contract Documents are in <br />addition to, and not in lieu of, the contractors general warranty. CONTRACTOR <br />shall not be relieved of general warranty obligations by the specification of specific <br />products or procedures." <br />13.09. In the first sentence of the paragraph OWNER, change the first line from "If <br />Contractor fails within a reasonable time after written notice of Engineer..." to read: <br />"If Contractor fails within ten (10) calendar days after written notice of <br />Engineer..." <br />ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION <br />In the first sentence of Paragraph 14.02.A.1., change the phrase "At least twenty days <br />before each progress payment is scheduled (but not more often than once a month), ... <br />to read: <br />"By no later than the first day of the month, ... ". <br />Following Paragraph 14.02.A.3 add: <br />4. An original Partial Release of Lien is required from the General Contractor <br />along with the application for Payment No. 1 and for each subsequent <br />application thereafter. For each application for payment (excluding <br />Application No. 1) the Contractor shall submit with the application Partial <br />Releases of Liens for all Notice to Owners that have been received for the <br />project by the Owner and Engineer ". <br />5. With each Application for Payment, the Contractor shall submit supporting <br />records and other evidence, in a form and amount acceptable to the City <br />and the Engineer, to demonstrate the expenses incurred and the Work <br />performed. This shall include, but not be limited to documentation related <br />to the purchase of Owner- Provided Material (if applicable) and the reduction <br />in the Contract Sum as a result of such expenditures. <br />6. Each application for Payment shall be based on the most recent schedule of <br />values submitted by Contractor in accordance with the Contract <br />Documents. The schedule of values shall allocate the entire guaranteed <br />maximum Contract Price among the various portions of the Work, except <br />that the Contractor's Fee shall be shown as a separate item. The schedule <br />of values shall be prepared in such form and supported by such data to <br />substantiate its accuracy as the Engineer may require. This schedule, unless <br />objected to by the Engineer, shall be used as a basis for reviewing the <br />Contractor's A pplications for Payment. <br />7. Applications for payment shall show the percentage of completion of each <br />portion of the Work as of the end of the period covered by the Application <br />for Payment. The percentage of completion shall be the lesser of: (1) the <br />SUPPLEMENTARY CONDITIONS 09/24 00800 -7 <br />