My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-10-01) Central Island Drainage & St. Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:15:06 AM
Creation date
1/19/2011 10:58:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage & St. Improv.
Bid No. (xx-xx-xx)
05-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' unreasoanbaly withheld. The stage of the progress of the Work shall be <br />determined by written agreement between the Owner and the Contractor, or if <br />no agreement is reached, by decision of the Engineer. <br />B. Immediately or prior to such partial occupancy or use, the Owner, Contractor, <br />and Engineer shall jointly inspect the area to be occupied or the portion of the <br />Work to be used in order to determine and record the condition of the Work. <br />' C. Unless otherwise agreed upon, partial occupancy or use of a portion or portions <br />of the Work shall not constitute acceptance of the Work not complying with the <br />Contract Documents." <br />After the least sentence in Paragraph 14.04.B, insert the following: <br />' "C. Once 1) the definitive certificate of completion has been issued to the Owner <br />and the Contractor and 2) once consent of the surety, if any, has been <br />obtained, the Owner shall make payment of Retainage applying to such Work or <br />designated portion thereof. Such payment shall be adjusted for Work that is <br />incomplete or not in accordance with the requirements of the Contract <br />Documents." <br />After the last sentence in the Paragraph 14.04.13, insert the following: <br />"Final payment, constituting the entire unpaid balance of the Contract Price, shall <br />be made by the Owner to the Contractor when the Contractor has fully performed <br />the Contract except for Contractor's responsibility to correct Work as provided in <br />Paragraphs 13.06 and 13.07, and to satisfy other requirements, if any, which <br />extend beyond final payment and after the Engineer sends written notice to Owner <br />that the Work is acceptable and in accordance with Paragraphs 14.07.B and <br />14.07.C." <br />Delete Paragraph 14.07.A.2 and 14.07.A.3 insert the following: <br />"The final Application for Payment shall be accompanied (except as previously <br />delivered) by: (1) an affidavit that payrolls, bills for materials and equipment, and <br />other indebtedness connected with the Work for which the Owner or the Owner's <br />property might be responsible or encumbered (less amounts withheld by Owner) <br />have been paid or otherwise been satisfied, (2) a certificate evidencing that <br />insurance required by the Contract Documents to remain in force after final <br />payment is currently in effect and will not be canceled or allowed to be expired <br />until at least 30 days' prior written notice has been given to the Owner, (3) a <br />written statement that the Contractor knows of no substantial reason that the <br />insurance will not be renewable to cover the period required by the Contract <br />Documents, (4) consent of the surety, if any, to final payment, and (5) if required <br />by the Owner, other data establishing payment or satisfaction of obligations, such <br />as receipts, releases, and waivers of liens, claims, security interests of <br />encumbrances arising out of the Contract, to the extent and in such form as may <br />be designated by the Owner, (6) all documentation as required by the Contract <br />SUPPLEMENTARY CONDITIONS 09/24 00800 -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.