Laserfiche WebLink
26 Are you going to supply a construction yard first for equipment, supplies, extra fill and dirt? <br />The staging area will be determined by the City. <br />27 He said that November 23, 2005 is an early date due to the fact that you are going to have <br />another meeting and they will only have a week to put this together and then the holiday will be here, <br />and he said that we should consider having a later bid opening date. <br />The bid opening date was issued by Addendum No <br />28 What about relocation of water lines? <br />We don't expect to relocate waterlines, the City of North Miami Beach who owns the system is <br />very efficient in repairing broken pipes. <br />29 Some of the water mains are right in the middle of structures <br />Any conflict with water mains during construction will be dealt in the field <br />30 What about raising existing sanitary lines with all the leveling? <br />We do not expect to relocate any sanitary sewer lines. <br />31 We must include in the prices from the items 430 - 171 -126, 430 - 171 -125, 430 - 171 -124 and <br />440 -1 -60, the restoration shown on the Sheet #41? <br />YES. See sheet No. 5, note No. 16, and sheet No. 41 for detail. <br />32 Is Well Point required or open pump dewatering is permitted? <br />No dewatering to streets or bodies of water without proper containment and silt barriers will <br />be permitted <br />33 Who is handling the FDEP reasonable assurance issue as it needs to be in place prior to <br />FDEP permit issuance. The reason is that the report needs to state the casing depth and that depth <br />needs to be accepted by FDEP before the bid. Since no one knows what FDEP will accept how can <br />the drilling contractor provide a quote based on an unknown? Additionally, FDEP may require <br />casing set that makes the wells deeper than the 100' indicated depth on the plans. <br />See notes 7 and 13 this Addendum <br />34 How does the well contractor receive payment for the additional footage beyond the 100'? <br />See note No. 13 <br />Questions /Comments Bid 05 -10 -01 Page 4 of 4 <br />