My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons Enterprises #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-01-02) Beach Access Signs
>
Pios & Sons Enterprises #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:11:28 AM
Creation date
1/19/2011 2:09:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Beach Access Signs
Bid No. (xx-xx-xx)
06-01-02
Project Type (Bid, RFP, RFQ)
Bid
Document Relationships
Bid opening report
(Message)
Path:
\City Clerk\Bids-RFQ-RFP\ITB\(06-01-02) Beach Access Signs
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />1 <br />6.16 <br />Emergencies ........ ............................... . ............ <br />00700 -23 <br />6.17 <br />Shop Drawings and Samples ........... ............................... <br />00700 -23 <br />6.18 <br />Continuing the Work .. ............................... . ............. <br />00700 -24 <br />6.19 <br />CONTRACTOR's General Warranty and Guarantee ........................... <br />00700 -25 <br />6.20 <br />Indemnification ................... ............................... <br />00700 -25 <br />ARTICLE 7 -OTHER WORK ............................ ....................... <br />00700 -26 <br />7.01 <br />Related Work at Site ................ ............................... <br />007()0-26 <br />7.02 <br />Coordination ... ............................... . ................ <br />00700 -26 <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES ..... . . ............................... . . <br />00700 -26 <br />8.01 <br />Communications to Contractor ......... ............................... <br />00700 -26 <br />8.02 <br />Replacement of ENGINEER ........... ............................... <br />()0700-26 <br />8.03 <br />Furnish Data .................... ............................... <br />00700 -26 <br />8.04 <br />Pay Promptly When Due ............. ............................... <br />00700 -26 <br />8.05 <br />Lands and Easements; Reports and Tests ... ............................... <br />()0700-26 <br />8.06 <br />Insurance .. . .................. ............................... . <br />00700-27 <br />8.07 <br />Change Orders .................................................. <br />00700 -27 <br />8.08 <br />Inspections, Tests, and Approvals ....... ............................... <br />00700 -27 <br />8.09 <br />Limitations on OWNER's Responsibilities .. ............................... <br />00700 -27 <br />8.10 <br />Undisclosed Hazardous Environmental Condition ............................ <br />00700 -27 <br />8.11 <br />Evidence of Financial Arrangements ...... ............................... <br />00700 -27 <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION ........................... <br />00700 -27 <br />9.01 <br />OWNER'S Representative ........................................... <br />....................... <br />00700 -27 <br />9.02 <br />Visits to Site ........ ............................... . ............ <br />00700 -27 <br />9.03 <br />Project Representative ............................... . .......... . .. <br />()07()0-27 <br />9.04 <br />Clarifications and Interpretations ....................... . .............. <br />00700 -28 <br />9.05 <br />Authorized Variations in Work ......... ............................... <br />00700-28 <br />9.06 <br />Rejecting Defective Work ............. ............................... <br />00700 -28 <br />9.07 <br />Shop Drawings, Change Orders and Payments .............................. <br />00700 -28 <br />9.08 <br />Determinations for Unit Price Work ...... ............................... <br />00700 -28 <br />9.09 <br />Decisions on Requirements of Contract Documents and Acceptability of Work .......... <br />00700 -28 <br />9.10 <br />Limitations on ENGINEER's Authority and Responsibilities ...................... <br />00700 -28 <br />ARTICLE 10 - <br />CHANGES IN THE WORK; CLAIMS .... ............................... <br />00700 -29 <br />10.01 <br />Authorized Changes in the Work ........ ............................... <br />00700 -29 <br />10.02 <br />Unauthorized Changes in the Work ...... ............................... <br />00700 -29 <br />10.03 <br />Execution of Change Orders ........... ............................... <br />00700 -29 <br />10.04 <br />Notification to Surety ............... ............................... <br />00700 -29 <br />10.05 <br />Claims and Disputes ................ ............................... <br />00700-30 <br />ARTICLE 1 I - <br />COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK .............. <br />00700 -30 <br />11.01 <br />Cost of the Work .................. ............................... <br />00700 -30 <br />11.02 <br />Cash Allowances .................. ............................... <br />00700 -32 <br />11.03 <br />Unit Price Work .................. ............................... <br />00700 -32 <br />ARTICLE 12 - <br />CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES ............. <br />00700 -33 <br />12.01 <br />Change of Contract Price ........................................... <br />00700 -33 <br />12.02 <br />Change of Contract Times ............ ............................... <br />00700 -33 <br />12.03 <br />Delays Beyond CONTRACTOR's Control .. ............................... <br />00700 -33 <br />12.04 <br />Delays Within CONTRACTOR's Control ... ............................... <br />00700 -34 <br />12.05 <br />Delays Beyond OWNER's and CONTRACTOR's Control ........................ <br />00700 -34 <br />12.06 <br />Delay Damages ................... ............................... <br />00700 -34 <br />ARTICLE 13 - <br />TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF <br />DEFECTIVE WORK ........................ ....................... <br />00700 -34 <br />13.01 <br />Notice of Defects .. :............... ............................... <br />00700 -34 <br />13.02 <br />Access to Work ...................... ........................... <br />00700 -34 <br />13.03 <br />e <br />Tests and Inspections ............... ............................... <br />00700 -34 <br />13.04 <br />Uncovering Work .................. ............................... <br />00700 -35 <br />13.05 <br />OWNER May Stop the Work ........... ............................... <br />00700 -35 <br />13.06 <br />Correction or Removal of Defective Work .. ............................... <br />00700 -35 <br />11 11 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.