My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons Enterprises #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-01-02) Beach Access Signs
>
Pios & Sons Enterprises #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2012 10:11:28 AM
Creation date
1/19/2011 2:09:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Beach Access Signs
Bid No. (xx-xx-xx)
06-01-02
Project Type (Bid, RFP, RFQ)
Bid
Document Relationships
Bid opening report
(Message)
Path:
\City Clerk\Bids-RFQ-RFP\ITB\(06-01-02) Beach Access Signs
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 1 - GENERAL REQUIREMENTS <br />1.01 General <br />in accordance with requirements of the Contract Documents. <br />Provide signage contract, coordinate all work and meet all <br />Fabricator must perform as required by <br />' ator representative required to coordinate all scheduling with <br />schedules. Fabric erate fully with the Client and Designer to <br />Client. Fabricator is expected to coop letion /delivery of the signage <br />prompt and accurate comp suppliers of <br />expedite, facilitate the p engage outside of his <br />elements. He or she shall coordinate with Engineer/owner cton <br />eleme ineer <br />equipment and services which the Eng <br />contract. <br />1.02 Pre - Construction Requirements o er channels for coordination. <br />Contractor to establish final specifications and proper <br />Representative. <br />Contractor to p rovide all samples requested by Designer/Client <br />1.03 Submittals by Fabricator <br />Shop Drawings for approval by Designer/Client. shape, imensions,) finishes, <br />A. Submit p all materials, shapes, <br />details of fabrication including <br />design loads, anchorage, and method of conan� 1Osubmitted toll Designer °for <br />of letter forms. All sign faces to be laid out <br />Approval. <br />B. Samples paint and materials as specified by <br />Fabricator must match <br />paint sample custom <br />Designer. Each p le on suitable substrate shall be submitted to <br />Designer prior to the commencement of fabrication. <br />Submit three (3) sets <br />for review /approval by Client and Designer) of <br />n <br />returnable samples of each custom color, material or finish as specified <br />these design documents. <br />C. Electrical Files le /Mac format. <br />The Designer shall provide electronic files in an Apple/Mac <br />of the job. <br />Fabricator to purchase proper type faces for the comp <br />it is ex ected that the awarded firm will hae NOTbequ� are and <br />Because P ed <br />a computer to open files, full size patterns of signs are <br />lementa Product Literature (not part of this contract) <br />D. Supp ry <br />The Fabricator will furnish Designer /Cli duct to be used in the Work- <br />describing the general properties of each product <br />E <br />02106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.