My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Miller Leg
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-03-01) Landscape Architectural Firms
>
Responses
>
Miller Leg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 8:39:00 AM
Creation date
1/19/2011 4:01:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landsc. Architect. Svcs.
Bid No. (xx-xx-xx)
06-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MILLER t\\>0EGG <br />Miramar Parkway Revitalization <br />Miromor, Florido <br />The Miller Legg design for the Miramar Parkway corridor <br />adjacent to US 441 creates a city gateway and facilitates the <br />revitalization of its commercial usage. Encouragement of <br />additional and safe pedestrian traffic for commercial usage <br />was key to this revitalization project. In addition, the use of <br />access management by creating shared parking areas, rather <br />than on- street parking, was implemented to improve the <br />aesthetics of the corridor and both pedestrian and vehicular <br />circulation. <br />Services Provided <br />• Master Planning <br />• Transportation Planning <br />• Landscape Architecture <br />Client(s): <br />fity of Miramar <br />IMPROVING COMMUNITIES. CREATING ENVIRONMENTS. <br />www.millerlegg.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.