My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Miller Leg
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-03-01) Landscape Architectural Firms
>
Responses
>
Miller Leg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 8:39:00 AM
Creation date
1/19/2011 4:01:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landsc. Architect. Svcs.
Bid No. (xx-xx-xx)
06-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
beginning with a baseball /softball <br />quadraplex. <br />FAU Lee Street Roadway Project - <br />Miller Legg is responsible for preparation <br />of construction plans for a 4 -lane divided <br />street and 1,600- parking spaces south of <br />the new Lee Street location, topographic <br />surveying, tree surveys, environmental <br />site assessment and permitting for <br />relocation of gopher tortoise and <br />burrowing owl locations, master <br />planning, civil engineering, electrical <br />engineering for street lighting, <br />mechanical engineering for new chilled <br />water main plant interconnection, <br />landscape architecture and irrigation <br />design plans, permitting with South <br />Miguel Juncal <br />Florida Water Management District and <br />Lake Worth Drainage District, and <br />construction phase services. This project <br />also required coordination with other <br />government agencies, including the <br />Florida Fish & Wildlife Conservation <br />Commission. <br />ME <br />
The URL can be used to link to this page
Your browser does not support the video tag.