My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RMPK Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-03-01) Landscape Architectural Firms
>
Responses
>
RMPK Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 3:02:45 AM
Creation date
1/19/2011 4:07:41 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landsc. Architect. Svcs.
Bid No. (xx-xx-xx)
06-03-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SELECTED PROJECTS <br />PARKS <br />• Pithlatchascotee River Greenway <br />• New Port Richey Swim Center <br />• New Port Richey Community Center <br />• Wilson Water Park <br />• Boynton Beach Community Center <br />• Veterans Park <br />• James E. Grey Preserve <br />• Davie Linear Park <br />• Rock Island Greenway Master Plan <br />• Quick Point Park <br />• Spring Lake Park <br />• Englewood Beach Park <br />• Flagler Ave Beachfront Promenade <br />• Sarasota Bayfront Master Plan <br />• Greenacres Park <br />• Sylvan Park <br />• Colonial Oaks Park <br />• Woodmere Park Design <br />• Carter Road Park Design <br />• Bay Street Park <br />• Stuart Park <br />• Green Bridge Park <br />• Broad Street Park <br />• Vineyards Park <br />• Carmalita Park <br />• Sims Park <br />• Moore Haven Park <br />• Boulder Reservoir Master Plan <br />• Polk County Regional Park Master <br />Plan <br />• Gillespi Neighborhood Park <br />• Community College Park <br />• Kingdom Park <br />• Estes Park Riverfront Park <br />• Lower Boulder Creek Master Plan <br />• Castaway Island Park <br />• University of Florida Sports <br />Complex <br />• Univ. of Florida Soccer Center <br />PARKS -OPEN SPACE MASTER <br />PLANS <br />■ Sarasota Parks and Connectivity <br />RUSSELL MOORE <br />pg 2 <br />Master Plan <br />■ Mount Dora Parks /Open Space <br />Maser Plan <br />• Key Largo Parks /Open Space <br />Master Plan <br />• New Port Richey Parks /Open Space <br />Master Plan <br />• Daytona Beach Parks /Open Space <br />Master Plan <br />• Lafayette Parks /Open Space Master <br />Plan <br />• Thornton Parks /Open Space Master <br />Plan <br />• Westminster Parks /Open Space <br />Master Plan <br />• Green River Parks /Open Space <br />Master Plan <br />URBAN /REGIONAL PLANNING <br />• Broward County Heritage Tourism <br />Plan <br />• Hollywood Beach Ecotourism Plan <br />• Palmetto Redevelopment Plan <br />• Sarasota Bayfront Master Plan <br />• Moore Haven Redevelopment Plan <br />• Lake Wales Citywide Plan <br />• Thomasville Redevelopment Plan <br />• Billings Urban Design Plan <br />• Boca Grande Plan <br />• Daytona Beach Plan <br />• Key Largo Eco- Tourism Plan <br />• Stuart Redevelopment Plan <br />• Ormond Beach Redevelopment <br />Strategy <br />• Cocoa Vision Plan <br />• Gainesville Redevelopment Strategy <br />• Estes Park Riverfront Plan <br />• Palmetto City -wide Plan <br />• Sarasota Vision Plan <br />• Port St. Joe Regional Plan <br />• East Naples Redevelopment Plan <br />• Pinetop- Lakeside Regional Plan <br />• Boca -Raton Visual Preference Survey <br />• Dade City Redevelopment Plan <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.