My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-01) Beach Access Signs
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:49:41 AM
Creation date
1/20/2011 3:10:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Beach Access Signs
Bid No. (xx-xx-xx)
06-06-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in Paragraph SC -4.2 of the Supplementary Conditions of the extend of the "technical data" <br />contained in such reports and drawings upon which PROVIDER is entitled to rely as provided <br />in Paragraph 4.02 of the General Conditions. PROVIDER acknowledges that such reports and <br />drawings are not Contract Documents and may not be complete for PROVIDER's purposes. <br />PROVIDER acknowledges that OWNER and ENGINEER do not assume responsibility for the <br />accuracy or completeness of information and data shown or indicated in the Contract <br />Documents with respect to Underground Facilities at or contiguous to the site. PROVIDER has <br />' obtained and carefully studied (or assumes responsibility for having done so) all such additional <br />supplementary examinations, investigations, explorations, tests, studies and data concerning <br />conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or <br />otherwise which may affect cost, progress, performance or furnishing of the Work or which <br />relate to any aspect of the means, methods, techniques, sequences and procedures of <br />construction to be employed by PROVIDER and safety precautions and programs incident <br />thereto. PROVIDER does not consider that any additional examinations, investigations, <br />explorations, tests, studies or data are necessary for the performance and furnishing of the <br />Work at the contract Price, within the Contract Times and in accordance with the other terms <br />and conditions of the Contract Documents. <br />' 7.5. PROVIDER is aware of the general nature of work to be performed by OWNER and <br />others at the site that relates to the Work as indicated in the Contract Documents. <br />7.6. PROVIDER has correlated the information known to PROVIDER, information and <br />observations obtained from visits to the site, reports and drawings identified in the Contract <br />Documents and all additional examinations, investigations, explorations, tests, studies and <br />data with the Contract Documents. <br />7.7. PROVIDER has given ENGINEER written notice of all conflicts, errors, ambiguities or <br />' discrepancies that PROVIDER has discovered in the Contract Documents and the written <br />resolution thereof by ENGINEER is acceptable to PROVIDER, and the Contract Documents are <br />generally sufficient to indicate and convey understanding of all terms and conditions for <br />I performance and furnishing of the Work. <br />Article 8. CONTRACT DOCUMENTS. <br />1 The Contract Documents which comprise the entire agreement between OWNER and PROVIDER <br />concerning the Work consist of the following: <br />' 05/06 00500 -4 03- 4122.E <br />8.1. <br />This Agreement (pages 1 to10, inclusive). <br />8.2. <br />Exhibits to this Agreement (page) N/A inclusive). <br />8.3. <br />Performance, Payment, and other Bonds, identified as exhibits 00600 and 00601 <br />and consisting of 4 pages. <br />' <br />8.4. <br />Notice to Proceed. <br />8.5. <br />General Conditions (pages 1 to 42 , inclusive). <br />8.6. <br />Supplementary Conditions (pages 0800 -1 to 00800 -7 , inclusive). <br />8.7. <br />Specifications bearing the title Beach Access Signs and consisting of 5 divisions, <br />as listed in Table of Contents thereof. <br />' 05/06 00500 -4 03- 4122.E <br />
The URL can be used to link to this page
Your browser does not support the video tag.