Laserfiche WebLink
1. Each item shall include a directly proportional amount of the <br />Contractor's overhead and profit. <br />D. The sum of all values listed in the schedule shall equal the total Contract <br />Sum. <br />E. Schedules are subject to Engineer's approval wherein additional line item <br />detail may be required. <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 — PRODUCTS (Not Used) <br />END OF SECTION <br />06/06 01370 -2 03-4138. C <br />