My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />�'l <br />e <br />SECTION 01505 <br />CONTROL OF WORK <br />1.01 QUALITY OF WORK <br />A. The Contractor shall furnish personnel and equipment which will be <br />efficient, appropriate and large enough to secure a satisfactory quality of <br />work and a rate of progress which will insure the completion of the work <br />within the time stipulated in the Proposal. If at any time such personnel <br />appear to the Engineer to be inefficient, inappropriate or insufficient for <br />securing the quality of work required or for producing the rate of progress <br />aforesaid, he may order the Contractor to increase the efficiency, change <br />the character or increase the personnel and equipment, and the Contractor <br />shall conform to such order. Failure of the Engineer to give such order shall <br />in no way relieve the Contractor of his obligations to secure the quality of <br />the work and rate of progress required. <br />1.02 OBSTRUCTIONS <br />A. The attention of the Contractor is drawn to the fact that during digging at the <br />Project site the possibility exists of the Contractor encountering water, <br />sewer, petroleum, gas, telephone, electrical, or other lines not shown on the <br />Drawings. The Contractor shall exercise extreme care before and during <br />digging to locate and flag these pipes so as to avoid damage to the existing <br />pipes. Should damage occur to an existing pipe, the Contractor shall repair <br />the pipe at no cost to the Owner. <br />B. The Contractor shall protect all existing utilities and improvements not <br />designated for removal and shall restore damaged or temporarily relocated <br />utilities and improvements to a condition equal to or better than they were <br />prior to such damage or temporary relocation, all in accordance with <br />requirements of the Contract Documents. <br />C. The Contractor shall verify the exact locations and depths of all utilities <br />shown and the Contractor shall make exploratory excavations of all utilities <br />that may interfere with the work. All such exploratory excavations shall be <br />performed as soon a practicable after award of the contract and, in any <br />event, a sufficient time in advance of construction to avoid possible delays <br />to the Contractor's work. When such exploratory excavations show the <br />utility location as shown to be in error, the Contractor shall so notify the <br />Engineer. <br />D. The number of exploratory excavations required should be that number <br />which is sufficient to determine the alignment and grade of the utility. Test <br />pits shall be dug at the Contractor's expense, as directed. <br />01505 -1 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.