My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 1.05 SALVAGE <br />1 o6/as <br />01505 -4 03- 4138.0 <br />A. <br />Any existing equipment or material including but not limited to, valves, <br />pipes, fittings, couplings, etc., which is removed or replaced as a result of <br />construction under this project may be designated as salvage by the <br />Engineer or City and if so shall be excavated, if necessary, and delivered to <br />the City by a location directed by the City. Any equipment or material not <br />worthy of salvaging, as directed by the Owner, shall be disposed of by the <br />Contractor at a suitable location. <br />PART 2 - <br />PRODUCTS (Not Used) <br />PART 3 - <br />EXECUTION <br />3.01 COOPERATION WITHIN THIS CONTRACT <br />A. <br />All firms or persons authorized to perform any work under this Contract <br />shall cooperate with the General Contractor and his subcontractors or <br />trades, and shall assist in incorporating the work of other trades where <br />necessary or required. <br />B. <br />Cutting and patching, drilling and fitting shall be carried out where required <br />by the trade or subcontractor having jurisdiction, unless otherwise indicated <br />herein or directed by the Engineer. <br />3.02 PROTECTION OF CONSTRUCTION AND EQUIPMENT <br />A. <br />All newly constructed work shall be carefully protected from injury in any <br />way. No wheeling or walking or placing of heavy loads on it shall be allowed <br />and all portions injured shall be reconstructed by the Contractor at his own <br />expense. <br />END OF SECTION <br />1 o6/as <br />01505 -4 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.