My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/06 <br />01510 -2 03-4138.0 <br />2.03 TEMPORARY WATER <br />A. <br />Arrange with the Owner to provide water for construction purposes. <br />B. <br />Install branch piping with taps located so that water is available throughout <br />the construction by the use of hoses. <br />C. <br />Install at each and every connection to the Owner water supply a backflow <br />preventor meeting the requirements of ANSI A40.6, latest revision. <br />Contractor shall be required to meter all water used. <br />2.04 TEMPORARY SANITARY FACILITIES <br />A. <br />Provide sanitary facilities in compliance with laws and regulations. <br />B. <br />Service, clean and maintain facilities and enclosures. <br />2.05 TEMPORARY HEAT AND VENTILATION <br />A. <br />Provide temporary ry heat and ventilation as required to maintain o adequate <br />environmental conditions to facilitate progress of the Work, to meet <br />specified minimum conditions for the installation of materials, and to <br />protect materials and finishes from damage due to temperature or <br />humidity. <br />B. <br />Provide adequate forced ventilation of enclosed areas for curing of <br />installed materials, to disperse humidity, and to prevent hazardous <br />accumulations of dust, fumes, vapors or gases. <br />C. <br />Portable heaters shall be standard approved units complete with controls. <br />D. <br />Pay all costs of installation, maintenance, operation and removal, and for <br />' <br />fuel consumed. <br />E. <br />Provide connections to existing facilities, extend and supplement with <br />' <br />temporary units as required to comply with requirements. Pay all costs of <br />installation, maintenance, operation and removal. Owner will pay costs of <br />fuel used from the existing system. <br />' <br />2.06 TEMPORARY <br />TELEPHONE SERVICE <br />A. <br />Arrange with local telephone service company, provide direct line <br />telephone service at the construction site for the use of personnel and <br />employees. Service required: <br />06/06 <br />01510 -2 03-4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.