My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 3.02 MIXING <br />A. Concrete shall be ready -mixed or transit - mixed, as produced by equipment <br />acceptable to the Engineer. No hand - mixing will be permitted. Adding <br />water in controlled amounts during the mixing cycle shall be done only with <br />the express approval of, and under the direction of, the Engineer. <br />B. Ready -mix or transit -mixed concrete shall be transported to the site in <br />watertight agitator or mixer trucks loaded not in excess of rated capacities <br />for the respective conditions as stated on the name plate. Discharge at the <br />site shall be within 1 -1/2 hours and within one hour when ambient <br />temperature is above 85 degree F after cement was first introduced into the <br />mix. Central mixed concrete shall be plant -mixed a minimum of 1 -1/2 <br />minutes per batch and then shall be truck -mixed or agitated a minimum of 8 <br />minutes. Agitation shall begin immediately after the pre -mixed concrete is <br />placed in the truck and shall continue without interruption until discharge. <br />Transit -mixed concrete shall be mixed at mixing speed for at least 10 <br />minutes immediately after charging the truck, followed by agitation without <br />interruption until discharged. <br />C. All central plant and rolling stock equipment and methods shall conform to <br />the latest Truck Mixer and Agitator Standards of the Truck Mixer <br />Manufacturers' Bureau of the National Ready -Mixed Concrete Association, <br />as well as ACI Standard 304 and ASTM Specification C94. <br />D. The re- tempering of concrete or mortar which has partially hardened, that <br />is, mixing with or without additional cement, aggregate, or water, will not be <br />permitted. <br />E. Attention is called to the importance of dispatching trucks from the batching <br />' plant so that they shall arrive at the site of the work just before the concrete <br />is required, thus avoiding excessive mixing of concrete while waiting or <br />delays in placing successive layers of concrete in the forms. <br />3.03 FIELD TESTS <br />A. Sets of four field control cylinder specimens will be taken at random by the <br />Engineer during the progress of the work, in conformity with ASTM <br />Designation C31; the total number of specimens taken on the project may <br />average one set per 150 cubic yards, and in general not less than one set <br />of specimens will be taken on any one day when concrete is being placed. <br />When average ultimate 28 -day strength of control cylinders in any set falls <br />below the required ultimate strength or below proportional minimum 7 day <br />strengths where proper relation between 7 and 28 day strengths have been <br />established by tests, proportions, water content, or temperature conditions <br />shall be changed to secure the required strength. <br />' B. The Contractor shall cooperate in the making of such tests to the extent of <br />allowing free access to the work for the selection of samples, providing <br />heated (when required) moist storage facilities for specimens, affording <br />protection to the specimens against injury or loss through his operations, <br />' and furnishing material and labor required for the purpose of taking <br />concrete cylinder samples, curing boxes and shipping boxes. All shipping of <br />specimens will be paid for by the Owner. <br />06/06 03300 -7 03-4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.