Laserfiche WebLink
E. Molding or bevels shall be placed to produce a 3/4 -inch chamfer on all <br />exposed projecting corners, unless otherwise shown on the Drawings. <br />Similar chamfer strips shall be provided at horizontal and vertical extremities <br />of all wall placements to produce "clean" separation between successive <br />placements as called for on the Plans. <br />F. Forms shall be sufficiently rigid to withstand vibration, to prevent <br />displacement or sagging between supports, and constructed so the <br />concrete will not be damaged by their removal. The Contractor shall be <br />entirely responsible for their adequacy. <br />G. Forms, including new pre -oiled forms, shall be oiled before reinforcement is <br />placed with an approved non - staining oil or liquid form coating having a <br />non - paraffin base. <br />H. Before form material is re -used, all surfaces in contact with concrete shall <br />be thoroughly cleaned, all damaged places repaired, all projecting nails <br />withdrawn, all protrusions smoothed and in the case of wood forms <br />pre - oiled. <br />I. Form ties encased in concrete shall be designed so that after removal of <br />the projecting part, no metal shall be within 1 -inch of the face of the <br />concrete. That part of the tie to be removed shall be at least 1/2 -inch <br />diameter or be provided with a wood or metal cone at lease 1/2 -inch in <br />diameter and 1 -inch long. Form ties in concrete exposed to view shall be <br />the cone - washer type equal to the Richmond "Tyscru ". Throughbolts or <br />common wire shall not be used for form ties. <br />3.07 PLACING AND COMPACTING <br />A. Unless otherwise permitted, the work begun on any day shall be completed <br />in daylight of the same day. <br />B. Concrete is not to be placed until reinforcing steel, pipes, conduits, sleeves, <br />hangers, anchors and other work required to be built into concrete have <br />been inspected and approved by the Engineer. Remove water and foreign <br />matter from forms and excavation. All soil bottom for slabs and footings <br />shall be approved by the Engineer before placing concrete. <br />C. Transport concrete from mixer to place of final deposit as rapidly as <br />practicable by methods which prevent separation of ingredients and <br />displacement of reinforcement, and which avoid re- handling. Partially <br />hardened concrete is not to be used. <br />D. "Cold joints" are to be avoided, but if they occur, are to be treated as <br />bonded construction joints. <br />' E. At construction joints the surfaces of the concrete already placed, including <br />vertical and inclined surfaces, shall be thoroughly cleaned of foreign <br />materials and laitance, and weak concrete and roughened with suitable <br />tools to expose a fresh face. At least two hours before and again shortly <br />before the new concrete is deposited, the joints shall be saturated with <br />water. After glistening water disappears, the joints shall be given a <br />thorough coating of neat cement slurry mixed to the consistency of very <br />heavy paste. The surfaces shall receive a coating at least 1/8 -inch thick, <br />06/06 03300 -9 03- 4138.0 <br />i <br />