My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dollars ($1000.00) for each day that expires after the time specified in paragraph 3.1 for <br />completion and readiness for final payment. <br />Article 4. CONTRACT PRICE. <br />OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract <br />Documents an amount in current funds equal to the sum of the amounts determined pursuant to <br />paragraphs 4.1 below: <br />FOR A LUMP SUM CONTRACT OF: <br />TOTAL BASE BID (Lump sum, Unit prices, and contingency items) <br />(use words) <br />IS <br />figures <br />As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, <br />and determinations of actual quantities and classification are to be made by ENGINEER as provided in <br />paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph <br />1 1 .03.13 of the General Conditions. <br />Article 5. PAYMENT PROCEDURES. <br />CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General <br />Conditions. Applications for Payment will be processed by ENGINEER as provided in the General <br />Conditions. <br />5.1. Progress Payments; Retainage. OWNER shall make progress payments on account of <br />the contract Price on the basis of CONTRACTOR's Applications for Payment as recommended <br />by ENGINEER, on or about the last day of each month during construction as provided in <br />paragraphs 5.1 .1 . and 5.1.2. below. All such payments will be measured by the schedule of <br />values established in paragraph 2.07 of the General Conditions (and in the case of Unit Price <br />Work based on the number of units completed) or, in the event there is no schedule of values, <br />as provided in the General Requirements. <br />5.1.1. Prior to Substantial Completion, progress payments will be made in an <br />amount equal to the percentage indicated below, but, in each case, less the <br />aggregate of payments previously made and less such amounts as ENGINEER shall <br />determine, or OWNER may withhold, in accordance with paragraph 14.02 of the <br />General Conditions. <br />90 % of Work completed (with the balance being retainage). If Work has <br />been 50% completed as determined by ENGINEER, and if the character and <br />progress of the Work have been satisfactory to OWNER and ENGINEER, <br />OWNER, on recommendation of ENGINEER, may determine that as long as <br />the character and progress of the Work remain satisfactory to them, there <br />will be no additional retainage on account of Work completed, in which case <br />the remaining progress payments prior to Substantial Completion will be in an <br />amount equal to 100% of the Work completed. <br />EJCDC STANDARD FORM OF AGREEMENT 00500 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.