My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q <br />5 <br />:9 <br />3.3 Bidders shall examine existing site improvements, and conditions, utilities, and streets to <br />determine all conditions, which will affect the Work. <br />INTERPRETATION OF BIDDING DOCUMENTS <br />4.1 All questions requiring clarification or interpretation of the Bidding Documents shall be <br />made in writing and shall reach the office of the Owner at least five (5) business days <br />prior to the date for receipt of bids. Direct all requests to the attention of the Project <br />Engineer at Calvin, Giordano & Associates, Inc., 1800 Eller Drive Suite 600, Fort <br />Lauderdale, FL 33316; Fax: 954- 921 -8807; Phone: 954- 921 -7781. <br />4.2 Any modification or interpretation of the Bidding Documents will be made by Addendum <br />to all who are recorded by the Engineer as having received a complete set of Bidding <br />Documents. <br />4.3 Interpretations or modifications of Bidding Documents made in any manner other than by <br />Addendum will not be binding. <br />4.4 A Bidder, prior to submitting his Bid, shall ascertain that he has received all Addenda <br />issued, and shall acknowledge their receipt in the Bid Form. <br />SUBSTITUTIONS <br />5.1 Bidders represent that their Bid is based upon the materials and equipment described in <br />the Bidding Documents. <br />5.2 Requests for substitutions will be considered prior to receipt of bids if they reach the <br />Engineer at least 5 days prior to the date for receipt of bids. <br />5.3 Acceptance by the Engineer of a proposed substitution will be issued in the form of an <br />Addendum or Substitution Request Form. <br />QUALIFICATION OF BIDDERS <br />6.1 If requested, the Bidder shall submit to the Engineer, prior to award of contract, a <br />properly completed Contractors Qualification Statement, along with any other evidence <br />of his satisfactory experience and ability to perform the proposed Work. <br />6.2 If requested by the Owner, the Bidder shall submit a certified financial statement, <br />prepared within the past 30 days, indicating current financial resources, liabilities, capital <br />equipment, and past history performance. <br />6.3 Bidders may be disqualified and their bids rejected for any of the following specific <br />reasons: <br />a. Reason to believe that collusion exists among Bidders. <br />b. Determination of lack of competency as may be revealed by qualification <br />statements, financial statements, experience records, or other questionnaires. <br />C. The Bidder's uncompleted work load which in the judgment of the Owner, may <br />cause detrimental impact on prompt completion of this project. <br />d. The Bidder is involved in any litigation against the Owner. <br />06/06 00100 -2 03- 4138.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.