My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-02) Alley Way Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:06:34 AM
Creation date
1/20/2011 3:56:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Alley Way Improvments
Bid No. (xx-xx-xx)
06-06-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00800 <br />FIRST AMENDED SUPPLEMENTARY CONDITIONS <br />The following supplements modify, change from or add to the Standard General Conditions <br />of the Construction Contract, EJCDC Document 1910 -8, 1996 Edition. Where any Article <br />of the General Conditions is modified or any Paragraph, Subparagraph or Clause thereof is <br />modified or deleted by these supplements, the unaltered provisions shall remain in effect. <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br />Add the following sentence to Paragraph 1 .01 .28 entitled "Notice of Award ": <br />"When requested by OWNER, the Notice of Award may be issued by the <br />ENGINEER." <br />Add the following sentence to Paragraph 1.01 .29 entitled "Notice to Proceed ": <br />"When requested by OWNER, the Notice to Proceed may be issued by <br />ENGINEER." <br />Add the following terms after Paragraph 1.01 50: <br />1.51 ARCHITECT /ENGINEER - The person, firm or corporation named as the <br />ENGINEER in the Agreement. <br />1.52 Provide - As used in the Project Manual, means to furnish and install, <br />complete and ready for intended use. <br />1.53 Product - As used in the Project Manual, includes materials, <br />fabrications, systems and equipment. <br />1.54 Project Manual - The volume of written construction documents, <br />' including the Bidding Documents, sample forms, and the Contract <br />Documents, such as the Conditions of the Contract and the Specifications. <br />1.55 Retainage — The percentage of the Contract Price, retained by Owner <br />from the progress payments to the Contractor for Work performed until the <br />Work is completed. It shall be payable to Contractor in accordance with the <br />' Contract Documents. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />Add the following to Paragraph 2.01: <br />"If the Work is to be commenced prior to execution of the Agreement in <br />response to a letter of intent, CONTRACTOR shall, prior to commencement <br />ISUPPLEMENTARY CONDITIONS <br />J - *#I <br />
The URL can be used to link to this page
Your browser does not support the video tag.