Laserfiche WebLink
6. Upon mutual agreement by Owner and Contractor, payment in full may <br />be made to those Subcontractors whose Work is fully completed during <br />the early stages of the Project. Notwithstanding Paragraphs 14.02.A.8 <br />' and 14.02.C.5 above, at such times as the Work as set forth in the <br />schedule of values has been 50% completed, and upon mutual <br />agreement of the Owner and Contractor, no further Retainage shall be <br />withheld from progress payments with respect to such portion of the <br />Work. Agreement as to any such reduction in retained amounts will not <br />constitute a waiver of or otherwise prejudice the Owner's right to <br />' subsequently reinstate full retainage, as to that subcontractor, should <br />circumstances justify such action in the Owner's sole judgment. <br />7. Upon Substantial Completion of the entire Work of the Contractor, a <br />sum, sufficient to increase payments to the Contractor to one hundred <br />percent (100 %) of the Contract Sum, less amounts, if any for incomplete <br />Work and unsettled claims, shall be paid to Contractor with the next <br />sequential payment application after Substantial Completion is obtained. <br />Delete Paragraph 14.05 and replace with the following: <br />' A. The Owner may occupy or use any completed or partially completed <br />portion of the Work at any stage when such portion is designated by <br />separate agreement with the Contractor, provided such occupancy or use <br />is consented by the insurer, in accordance with Paragraph 5.06.A.5 and <br />as authorized by public authorities having jurisdiction over the Work. <br />' Such partial occupancy or use may commence whether or not the portion <br />is substantially complete, provided Owner and Contractor have accepted <br />in writing the responsibilities assigned to each of them for payments, <br />' Retainage, if any, security, maintenance, heat, utilities, damage to Work <br />and insurance, and have agreed in writing concerning the period for <br />correction of Work and commencement of warranties required by the <br />' Contract Documents. When the Contractor considers a portion <br />substantially complete, the Contractor shall prepare and submit a <br />comprehensive list to the Engineer of the items to be completed or <br />corrected prior to final payment. The Failure to include an item on such <br />list does not alter the responsibility of the Contractor to complete all <br />Work in accordance with the Contract Documents. Consent of the <br />Contractor to partial occupancy or use shall not be unreasoanbaly <br />withheld. The stage of the progress of the Work shall be determined by <br />written agreement between the Owner and the Contractor, or if no <br />' agreement is reached, by decision of the Engineer. <br />B. Immediately or prior to such partial occupancy or use, the Owner, <br />' Contractor, and Engineer shall jointly inspect the area to be occupied or <br />the portion of the Work to be used in order to determine and record the <br />condition of the Work. <br />ISUPPLEMENTARY CONDITIONS <br />1 <br />00800 -10 <br />