Laserfiche WebLink
� I <br />SECTION 01025 <br />MEASUREMENT AND PAYMENT <br />PART 1 - GENERAL <br />1.01 RELATED REQUIREMENTS <br />A. General provisions of Contract, including General and Supplementary <br />Conditions. <br />B. Other Division -1 Specification Sections. <br />1.02 SECTION INCLUDES <br />A. Administrative and procedural requirements for determining Work <br />completed under unit price contract. <br />1.03 GENERAL REQUIREMENTS <br />1 <br />' 06/06 <br />1 <br />A. Lump Sum and unit prices shall include the providing of all costs required <br />for the complete demolition as noted, construction of the specified unit of <br />work including cost of materials and delivery; cost of installation labor, <br />including social security, insurance, and other required fringe benefits, <br />workman's compensation insurance; bond premiums; rental of equipment <br />and machinery; taxes; testing; surveys and other incidental expenses; and <br />supervision. <br />B. The Owner reserves the right to reject the Contractor's measurement of <br />completed work that involves use of established unit prices, and to have <br />this Work measured by an independent surveyor acceptable to the <br />Contractor at the Owner's expense. <br />C. Contract Sum adjustments will be by Change Order on basis of net <br />accumulative change for each unit price category. <br />1. Except as otherwise specified, unit prices shall apply to both <br />deductive and additive variations of quantities. <br />2. Lump sum and unit prices in the Agreement shall remain in effect <br />until date of final completion of the entire Work. <br />D. Partial payment for material and equipment properly stored and protected <br />will be made in accordance with requirements of the General Conditions. <br />01025 -1 03- 4138.0 <br />