Laserfiche WebLink
Alley Way Improvements <br />UNIT PRICE BID SCHEDULE <br />Item Estimated <br />No. Description Quantity Unit Unit Price Estimated Amount <br />I. DEMOLITION /SITE PREPARATION <br />1. Demolish and remove all existing structures <br />within the alley way <br />II. CIVIL WORK <br />2. Furnish and install six -foot (6') shadowbox <br />fence, including paint. <br />III. GENERAL <br />3. Maintenance of Traffic <br />4. Mobilization and Demobilization of all <br />equipment and personnel (not to exceed 5% of <br />total bid amount) <br />5. Contingency (20% of bid amount) <br />GRAND TOTAL (Items 1 -5) <br />1,790 <br />LS $ 021 S 00,x0 $ � �2, .5-CCI <br />LF $ 605.00 <br />351) , "10 <br />LS $ 2-S-00-00 $ 2 y SCX� . 00 <br />1 LS $ V ;�; f .00 $ (e3(b5L4 . 0cb <br />1 LS $ HUOLI0•180 $ 4(0,0y0 ,'b0 <br />$ 2 -1u, 2-L4 -- - )?) o <br />f tu%c n v �ro ✓ SSA S) k `Wl 6U Sa N ✓ H-w'j �+ ✓► c Ye� U✓"i �v�' I !'a � � 011+ <br />`1 J <br />(Written) <br />� n � <br />1 <br />(Au horized sign ture <br />07 , 1q, Vu <br />(Date) <br />06; 06 00300 -2 03- 4138.0 <br />c.Q <br />