Laserfiche WebLink
r <br />1 warranty commencing at the time of Owner acceptance, the Contractor <br />shall obtain from the manufacturer a two (2) year warranty starting at the <br />time of Owner acceptance of the equipment. <br />1.05 HURRICANE PREPAREDNESS PLAN <br />ri <br />I� <br />I <br />1 <br />fl <br />A. Within thirty days of the date of Notice to Proceed, the Contractor shall <br />submit to the Engineer and Owner a Hurricane Preparedness Plan. The <br />plan should outline the necessary measures which the Contractor proposes <br />to perform at no additional cost to the Owner in case of a hurricane warning. <br />B. In the event of inclement weather, or whenever Engineer shall direct, <br />Contractor will cause Subcontractors to protect carefully the Work and <br />materials against damage or injury from the weather. If, in the opinion of <br />the Engineer, any portion of Work or materials shall have been damaged or <br />injured by reason of failure on the part of Contractor or any Subcontractor to <br />so protect the Work, such Work and materials shall be removed and <br />replaced at the expense of the Contractor. <br />1.06 EQUIPMENT, TESTING & INSPECTION <br />A. Regardless of the number of days specified in the individual sections for the <br />manufacturers representative to be present on the site for inspection and <br />testing, if the equipment fails to perform as specified then the representative <br />shall remain on site until the malfunction is corrected and the Owner <br />received specified days of inspection or testing. <br />B. The cost for the additional days required shall not be added to the cost of <br />the Owner, but shall be to the account of the Contractor. <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 — EXECUTION (Not Used) <br />END OF SECTION <br />1 07/06 01030 -2 <br />05 -5564 <br />