My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-03) Town Center Park Entry Sign
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:32:06 AM
Creation date
1/20/2011 5:12:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Entry Sign
Bid No. (xx-xx-xx)
06-06-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� I <br />II <br />C. Each sample shall have a label indicating <br />1. Name of Project <br />2. Name of Contractor and Subcontractor <br />3. Material or Equipment Represented <br />4. Place of Origin <br />5. Name of Producer and Brand (if any) <br />6. Location in Project <br />(Samples of finished materials shall have additional marking that will <br />identify them under the finished schedules.) <br />D. The Contractor shall prepare a transmittal letter in triplicate for each <br />shipment of samples containing the information required in subparagraph <br />1.0713 above. He shall enclose a copy of this letter with the shipment and <br />send a copy of this letter to the Engineer. Approval of a sample shall be <br />only for the characteristics or use named in such approval and shall not <br />be construed to change or modify any Contract requirements. <br />E. Approved samples not destroyed in testing shall be sent to the Engineer <br />or stored at the site of the work. Approved samples of the hardware in <br />good condition will be marked for identification and may be used in the <br />work. Materials and equipment incorporated in work shall match the <br />approved samples. Samples which failed testing or were not approved <br />samples will be returned to the Contractor at his expense, if so requested <br />at time of submission. <br />PART 2 - PRODUCTS (Not Used). <br />PART 3 - EXECUTION (Not Used). <br />07/06 <br />END OF SECTION <br />01340 -7 <br />05 -5564 <br />
The URL can be used to link to this page
Your browser does not support the video tag.