My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-03) Town Center Park Entry Sign
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:32:06 AM
Creation date
1/20/2011 5:12:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Entry Sign
Bid No. (xx-xx-xx)
06-06-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1.04 CONTRACTOR'S RESPONSIBILITIES <br />' A. Cooperate with laboratory personnel, and provide access to Work and pay <br />for testing. <br />B. Secure and deliver to the laboratory adequate quantities of <br />representational samples of materials proposed to be used and which <br />require testing. <br />C. Provide to the laboratory the preliminary design mix proposed to be used <br />for concrete, and other materials mixes which require control by the <br />testing laboratory. <br />D. Materials and equipment used in the performance of work under this <br />Contract are subject to inspection and testing at the point of manufacture <br />or fabrication. Standard specifications for quality and workmanship are <br />indicated in the Contract Documents. The Engineer may require the <br />Contractor to provide statements or certificates from the manufacturers <br />and fabricators that the materials and equipment provided by them are <br />manufactured or fabricated in full accordance with the standard <br />specifications for quality and workmanship indicated in the Contractor <br />Documents. All costs of this testing and providing statements and <br />certificates shall be a subsidiary obligation of the Contractor, and no extra <br />charge to the Owner shall be allowed on account of such testing and <br />certification. <br />E. Furnish incidental labor and facilities: <br />1. To provide access to Work to be tested <br />' 2. To obtain and handle samples at the Project site or at the source of <br />the product to be tested <br />' 3. To facilitate inspections and tests <br />4. For storage and curing of test samples <br />F. Notify laboratory sufficiently in advance of operations to allow for <br />laboratory assignment of personnel and scheduling of tests. <br />G. Employ and pay for the services of the same or a separate, equally <br />qualified independent testing laboratory to perform additional inspections, <br />sampling and testing required for the Contractor's convenience. <br />H. Provide the Engineer with a copy of all test and reports. <br />' 07/06 01410 -2 05 -5564 <br />
The URL can be used to link to this page
Your browser does not support the video tag.