My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-03) Town Center Park Entry Sign
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:32:06 AM
Creation date
1/20/2011 5:12:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Entry Sign
Bid No. (xx-xx-xx)
06-06-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Hand excavate bottom cut to accurate elevations and support pipe <br />or conduit on undisturbed soil. <br />' 4. For pipes or conduit 6 in. or larger, tanks and other work indicated <br />to receive subbase, excavate to subbase depth indicated, or, if not <br />' otherwise indicated, to 6 in. below bottom of work to be supported. <br />5. Except as otherwise indicated, excavate for exterior water - bearing <br />piping so top of piping is minimum 30" below finished grade. <br />6. Grade bottoms of trenches as indicated, notching under pipe bells <br />1 to provide solid bearing for entire body of pipe. <br />N. Do not backfill trenches until tests and inspections have been made and <br />backfilling authorized by Engineer. <br />3.04 PIPE INTERFERENCES <br />1 A. The contractor shall abide b the following schedule of criteria concerning <br />Y 9 9 <br />interferences with other utilities. <br />1. In no case shall there be less than 0.3 feet between et een any two <br />' pipelines and structures. <br />2. Class I Concrete Encasement: Wherever there is more than 0.3 <br />1 foot, but not less than 1.5 foot clearance between water mains or <br />water services, then a concrete encasement shall be provided in <br />accordance with the typical detail as shown on the Drawings. <br />!j 3. Class II Concrete Encasement: Wherever there is more than 0.3 <br />foot, but less than 1.0 foot clearance between any two pipe lines, or <br />' between pipe lines and structures, then a concrete encasement <br />shall be provided in accordance with the typical detail as shown on <br />the Drawings. <br />' B. The Engineer shall have full authority to direct the placement of the <br />various pipes and structures in order to facilitate construction, expedite <br />' completion and to avoid conflicts. <br />3.05 BACKFILLING <br />A. Backfilling over pipes shall begin as soon as practical after the pipe has <br />been laid, jointed, and inspected and the trench filled with suitable <br />' compacted material to the mid - diameter of the pipe. <br />B. All backfilling shall be prosecuted expeditiously as work permits, but not <br />1 07106 02221 -9 05 -5564 <br />
The URL can be used to link to this page
Your browser does not support the video tag.