Laserfiche WebLink
' Hand excavate bottom cut to accurate elevations and support pipe <br />or conduit on undisturbed soil. <br />' 4. For pipes or conduit 6 in. or larger, tanks and other work indicated <br />to receive subbase, excavate to subbase depth indicated, or, if not <br />' otherwise indicated, to 6 in. below bottom of work to be supported. <br />5. Except as otherwise indicated, excavate for exterior water - bearing <br />piping so top of piping is minimum 30" below finished grade. <br />6. Grade bottoms of trenches as indicated, notching under pipe bells <br />1 to provide solid bearing for entire body of pipe. <br />N. Do not backfill trenches until tests and inspections have been made and <br />backfilling authorized by Engineer. <br />3.04 PIPE INTERFERENCES <br />1 A. The contractor shall abide b the following schedule of criteria concerning <br />Y 9 9 <br />interferences with other utilities. <br />1. In no case shall there be less than 0.3 feet between et een any two <br />' pipelines and structures. <br />2. Class I Concrete Encasement: Wherever there is more than 0.3 <br />1 foot, but not less than 1.5 foot clearance between water mains or <br />water services, then a concrete encasement shall be provided in <br />accordance with the typical detail as shown on the Drawings. <br />!j 3. Class II Concrete Encasement: Wherever there is more than 0.3 <br />foot, but less than 1.0 foot clearance between any two pipe lines, or <br />' between pipe lines and structures, then a concrete encasement <br />shall be provided in accordance with the typical detail as shown on <br />the Drawings. <br />' B. The Engineer shall have full authority to direct the placement of the <br />various pipes and structures in order to facilitate construction, expedite <br />' completion and to avoid conflicts. <br />3.05 BACKFILLING <br />A. Backfilling over pipes shall begin as soon as practical after the pipe has <br />been laid, jointed, and inspected and the trench filled with suitable <br />' compacted material to the mid - diameter of the pipe. <br />B. All backfilling shall be prosecuted expeditiously as work permits, but not <br />1 07106 02221 -9 05 -5564 <br />