Laserfiche WebLink
F� <br />�L� <br />11 <br />11 <br />1 <br />1 <br />J <br />it <br />1 <br />20. Field Order - -A written order issued by <br />Engineer which requires minor changes in the Work but <br />which does not involve a change in the Contract Price or <br />the Contract Times. <br />21. General Requirements -- Sections of Division <br />1 of the Specifications. The General Requirements pertain <br />to all sections of the Specifications. <br />22. Hazardous Environmental Condition - -The <br />presence at the Site of Asbestos, PCBs, Petroleum, <br />Hazardous Waste, or Radioactive Material in such <br />quantities or circumstances that may present a substantial <br />danger to persons or property exposed thereto in <br />connection with the Work. <br />23. Hazardous Waste - -The term Hazardous <br />Waste shall have the meaning provided in Section 1004 of <br />the Solid Waste Disposal Act (42 USC Section 6903) as <br />amended from time to time. <br />24. Laws and Regulations; Laws or Regulations - <br />-Any and all applicable laws, rules, regulations, ordinanc- <br />es, codes, and orders of any and all governmental bodies, <br />agencies, authorities, and courts having jurisdiction. <br />25. Liens -- Charges, security interests, or <br />encumbrances upon Project funds, real property, or <br />personal property. <br />26. Milestone - -A principal event specified in the <br />Contract Documents relating to an intermediate comple- <br />tion date or time prior to Substantial Completion of all the <br />Work. <br />27. Notice of Award - -The written notice by <br />Owner to the Successful Bidder stating that upon timely <br />compliance by the Successful Bidder with the conditions <br />precedent listed therein, Owner will sign and deliver the <br />Agreement. <br />28. Notice to Proceed - -A written notice given by <br />Owner to Contractor fixing the date on which the Con- <br />tract Times will commence to run and on which <br />Contractor shall start to perform the Work under the <br />Contract Documents. <br />29. Owner- -The individual or entity with whom <br />Contractor has entered into the Agreement and for whom <br />the Work is to be performed. <br />30. PCBs -- Polychlorinated biphenyls. <br />31. Petroleum -- Petroleum, including crude oil or <br />any fraction thereof which is liquid at standard conditions <br />of temperature and pressure (60 degrees Fahrenheit and <br />14.7 pounds per square inch absolute), such as oil, <br />petroleum, fuel oil, oil sludge, oil refuse, gasoline, <br />kerosene, and oil mixed with other non- Hazardous Waste <br />and crude oils. <br />32. Progress Schedule - -A schedule, prepared and <br />maintained by Contractor, describing the sequence and <br />duration of the activities comprising the Contractor's plan <br />to accomplish the Work within the Contract Times. <br />33. Project - -The total construction of which the <br />Work to be performed under the Contract Documents may <br />be the whole, or a part. <br />34. Project Manual - -The bound documentary <br />information prepared for bidding and constructing the <br />Work. A listing of the contents of the Project Manual, <br />which may be bound in one or more volumes, is <br />contained in the table(s) of contents. <br />35. Radioactive Material -- Source, special nucle- <br />ar, or byproduct material as defined by the Atomic Energy <br />Act of 1954 (42 USC Section 2011 et seq.) as amended <br />from time to time. <br />36. Related Entity -- An officer, director, partner, <br />employee, agent, consultant, or subcontractor. <br />37. Resident Project Representative - -The autho- <br />rized representative of Engineer who may be assigned to <br />the Site or any part thereof. <br />38. Samples -- Physical examples of materials, <br />equipment, or workmanship that are representative of <br />some portion of the Work and which establish the <br />standards by which such portion of the Work will be <br />judged. <br />39. Schedule of Submittals - -A schedule, prepared <br />and maintained by Contractor, of required submittals and <br />the time requirements to support scheduled performance <br />of related construction activities. <br />40. Schedule of Values - -A schedule, prepared <br />and maintained by Contractor, allocating portions of the <br />Contract Price to various portions of the Work and used <br />as the basis for reviewing Contractor's Applications for <br />Payment. <br />41. Shop Drawings - -All drawings, diagrams, <br />illustrations, schedules, and other data or information <br />which are specifically prepared or assembled by or for <br />Contractor and submitted by Contractor to illustrate some <br />portion of the Work. <br />42. Site - -Lands or areas indicated in the Contract <br />Documents as being furnished by Owner upon which the <br />Work is to be performed, including rights -of -way and <br />easements for access thereto, and such other lands <br />furnished by Owner which are designated for the use of <br />Contractor. <br />43. Specifications- -That part of the Contract <br />Documents consisting of written requirements for <br />materials, equipment, systems, standards and <br />workmanship as applied to the Work, and certain <br />EJCDC C -700 Standard General Conditions of the Construction Contract. <br />Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700-7 <br />