r� <br />1 <br />0 <br />0 <br />VA <br />LO <br />a) <br />03 <br />c) <br />With each Application for Payment, the Contractor shall submit <br />supporting records and other evidence, in a form and amount <br />acceptable to the City and the Engineer, to demonstrate the expenses <br />incurred and the Work performed. This shall include, but not be <br />limited to documentation related to the purchase of Owner - Provided <br />Material and the reduction in the Contract Sum as a result of such <br />expenditures. <br />Each application for Payment shall be based on the most recent <br />schedule of values submitted by Contractor in accordance with the <br />Contract Documents. The schedule of values shall allocate the entire <br />guaranteed maximum Contract Price among the various portions of <br />the Work, except that the Contractor's Fee shall be shown as a <br />separate item. The schedule of values shall be prepared in such form <br />and supported by such data to substantiate its accuracy as the <br />Engineer may require. This schedule, unless objected to by the <br />Engineer, shall be used as a basis for reviewing the Contractor's <br />Applications for Payment. <br />Applications for payment shall show the percentage of completion of <br />each portion of the Work as of the end of the period covered by the <br />Application for Payment. The percentage of completion shall be the <br />lesser of: (1) the percentage of that portion of the Work which has <br />actually been completed; or (2) the percentage obtained by dividing <br />(a) the expense that has actually been incurred by the Contractor on <br />account of that portion of the Work for which the Contractor has <br />made or intends to make actual payment prior to the next Application <br />for Payment by (b) the share of the Contract Price allocated to that <br />portion of the Work in the schedule of values. <br />Subject to the provisions of the Contract Documents, the amount of <br />progress payments shall be computed as follows: <br />take that portion of the Contract Price properly allocable to the <br />computed Work as determined by multiplying the percentage <br />of completion of each portion of the Work in the schedule of <br />values. Pending final determination of the costs to the Owner <br />of changes in the Work, amounts not in dispute shall be <br />included in the Application for Payment along with Change <br />Order, Work Change Directive or Written Amendment <br />indicating the parties' agreement with all or part of such costs <br />for additional Work. <br />add the portion of the Contract Price properly allocable to <br />materials and equipment delivered and suitably stored at the <br />site for subsequent incorporation in the Work, or, if approved <br />in advance by Owner, suitably stored off -site at a location <br />agreed upon in writing. <br />add the Contractor's Fee, less the ten percent (10 %) <br />Retainage. The Contractor's Fee shall be computed upon the <br />Cost of the Work described in the preceding clauses at the rate <br />in accordance with Paragraph 11.01.0 or, if the Contractor's <br />Fee is stated as a fixed sum, then it shall be an amount that <br />SUPPLEMENTARY CONDITIONS 00800 -8 <br />