My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Johnson Engineering Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-12-01) Professional Planning and Zoning Cosult Svcs
>
Responses
>
Johnson Engineering Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 2:41:58 PM
Creation date
1/4/2017 2:37:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />David Trouteaud, P.E. Utilities a. TOTAL 11 b. WITH CURRENT FIRM 11 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Johnson Engineering, Fort Myers, Florida <br /> <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State And Discipline) <br />B.S. - Civil Engineering Florida-P.E. <br /> <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Florida Engineering Society, Young Professionals, Coastal Conservation Association <br /> <br /> <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />Marion Street Force Main Improvements <br />Fort Myers, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION (If applicable) <br />2011 <br />a. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />David was a project engineer for the design and hydraulic modeling of approximately 2.5 miles of 16-inch force <br />main within the City of Fort Myers. This project included modeling the effect of redirecting flow from approximately <br />30 lift stations throughout the City. Presently he is responsible for the construction phase of this project throughout the <br />completion date of July 2010. <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />Southwest 6 & 7, Utility Expansion <br />Cape Coral, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2015 <br />b. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />David is the engineer of record for Areas 1 and 2 and is the project manager for the inspection team of Areas 1, 2, 9 <br />and 10. The four areas combined entail the installation of approximately 16.2 miles of gravity sewer, 17.4 miles of <br />water main, 18.7 miles of irrigation main, 3.7 miles of force main and replacing 2.4 miles of storm culverts. Along with <br />the tremendous amount of pipe that is being installed, a unique feature about this project is coordination with the <br />endangered species within the area. <br /> <br /> <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />Phase III-C Utility Improvements <br />City of Fort Myers, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If applicable) <br />2013 <br />c. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />This project consisted of the design of approximately 90,000 linear feet of gravity sewer main, 26,000 linear feet <br />of potable water main and improvements to the existing drainage system. This project was a one square mile area <br />involving residential, multi-family, commercial and light industrial properties and involved $20 Million in water and <br />sewer improvements. Johnson Engineering provided survey, design, permitting, hydraulic modeling, bidding assistance, <br />construction phase services. <br /> <br /> <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />Treeline Master Pump Station <br />City of Fort Myers, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />2010 <br />d. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As project manager for this 4,000 gallon per minute pump station, Dave assisted in the design, obtained all of the <br />necessary permits, and assisted in all the necessary construction phase services to ensure a high quality master pump <br />station. At full build out this pump station is designed to pump wastewater from more than 5 percent of the City’s <br />entire wastewater. <br /> <br /> <br /> <br /> STANDARD FORM 330 (1/2004) Page 2
The URL can be used to link to this page
Your browser does not support the video tag.