Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Ricardo Acosta, P.E., C.F.M. Drainage a. TOTAL 14 b. WITH CURRENT FIRM 10 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Johnson Engineering, Fort Myers, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S. - Civil Engineering Florida P.E./Engineering <br /> ASFPM Certified Floodplain Manager, Certificate No. <br /> US-13-07110 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />City of Naples Basin III Stormwater Improvements <br />City of Naples, Florida <br /> <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If applicable) <br />2012 <br /> <br />a. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Assisted in the design and permitting of storm water improvements serving approximately 480 ac in the downtown <br />Naples area. This project involves installation of pipes and construction of detention areas along approximately 1.5 <br />miles of roadways <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />SR 31 <br />Lee & Charlotte County, Florida <br /> <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br /> <br /> <br />b. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Assisted in the design and permitting of the surface water management system for the approximately four mile <br />roadway expansion project <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />Powell Creek Preserve Filter Marsh <br />Lee County, Florida <br /> <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If applicable) <br />2013 <br /> <br />c. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The Powell Creek Preserve Filter Marsh will provide pollutant removal and reduction of existing impairments to the <br />Powell Creek watershed by pumping flows into a created 20-acre filter marsh system. Also, the trails adjacent to the <br />marsh will provide educational opportunities. Our team preformed a wide variety of design and permitting activities, <br />including wetland delineation, protected species surveys, mitigation design, environmental permitting and modeling and <br />design of the surface water management system and permitting through SFWMD, ACOE, FWC and Lee County. <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />Town of Fort Myers Beach - Basin Based Drainage Improvements <br />Fort Myers Beach, Florida <br /> <br /> <br />(2) YEAR COMPLETED <br /> <br /> <br /> <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />Ongoing <br /> <br />d. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Johnson Engineering provided civil engineering design and permitting of drainage improvements within approximately <br />9 acres of right-of-way, serving approximately 70 acres of developed lands in Fort Myers Beach. <br /> <br /> STANDARD FORM 330 (1/2004) Page 2