My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Johnson Engineering Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-12-01) Professional Planning and Zoning Cosult Svcs
>
Responses
>
Johnson Engineering Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 2:41:58 PM
Creation date
1/4/2017 2:37:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br /> KEY NUMBER <br />7 <br />21. TITLE AND LOCATION (City and State) <br />Cleveland Avenue Corridor Redevelopment Plan <br />City of Fort Myers, Florida <br />22. YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br /> <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Fort Myers <br />b. POINT OF CONTACT NAME <br />Ms. Leigh Scrabis, E.I. <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(239) 321-7100 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />We assisted with adoption of the Cleveland Avenue <br />Redevelopment Plan, as well as a new strategy for <br />development of property within the Community <br />Redevelopment Agency. The project included <br />inventory of property data, land use, and zoning. <br />Our team assisted City staff with facilitation of an <br />initial public input meeting to arrive at property <br />owner and stakeholder preferences for the <br />corridor. We helped develop strategies for low <br />impact development incentives and improved <br />pedestrian facilities. Our GIS staff and designers <br />provided graphics to support all aspects of the <br />project. We assisted City staff with facilitation of a <br />second public meeting to review the strategy. <br />Project Cost: $30,000 <br />Related Discipline: Drafting of Codes, Standards <br />and Ordinances, Public Involvement, Water <br />Resources <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. (1) FIRM NAME <br />Johnson Engineering <br />(2) FIRM LOCATION (City and State) <br />Fort Myers, Florida <br />(3) ROLE <br />Drafting of Codes, Standards and Ordinances, Public <br />Involvement, Water Resources <br />b. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />c. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />STANDARD FORM 330 (1/2004) Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.