My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-12-01) Professional Planning and Zoning Cosult Svcs
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 3:35:23 PM
Creation date
1/4/2017 3:31:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ# 16-12-01 | Professional Planning and Zoning Consulting ServicesSunny Isles Beach <br />DCA and cited in the University of Florida publication <br />Greenhouse Gas Reduction and Energy Conservation: <br />Development Impacts Under Florida HB 697. The re-port specifically notes strategies included in the new comprehensive plan for Loxahatchee Groves such as requiring land use changes to be reviewed based upon energy efficiency and discouragement of sprawl, de-velopment to be “transit-ready” along major routes, and maintaining agriculture to reduce heat island ef-fects. UF noted the CGA-authored amendments to the Medley Comprehensive Plan, prepared through Eval-uation and Appraisal Report (EAR)-based Compre-hensive Plan Amendments, included strategies such as alternate energy production as an allowed use in Industrial land uses and requiring energy efficiency in new buildings. Noted Weston policies include de-veloping review criteria for placement of photovoltaic cells, and maintaining and improving the City’s exten-sive bikeway network with access to significant com-mercial, employment, and recreational centers. <br />Support for Lawsuit against SB360 and Under- <br />standing Local Government Concerns: CGA plan-ners and transportation engineers provided technical support to the City of Weston which led the legal chal-lenge to SB360 in 2009. The City of Weston, along with 19 other communities asserted that the bill (SB360) would have a detrimental impact on local govern-ments, forcing "unfunded mandates" to build the in-frastructure needed to support growth. CGA Senior Vice President, Shelley Eichner, AICP, provided a key affidavit in the finding that SB360 was an unfunded mandate. <br />PERFORMANCE RECORDSCGA has an exemplary record of performance with each of its contracts. Company-wide, CGA has never had a contract terminated or canceled for cause. <br />SCHEDULING AND BUDGET CGA is committed to completing all projects under this contract on-time and within budget. To ensure this commitment is met, CGA will manage staff schedules to ensure they are adequately available to support the workload as needed. CGA utilizes Ajera to manage the full project lifecycle of each project. As one of our proj-ect management tools, the system controls all aspects of the project including accounting, project manage-ment, and resource utilization in real-time. This sys-tem is web based allowing both internal and remotely placed employees full function capabilities via any in-ternet connection. The system not only keeps a “live” accounting of all of our projects budgets, earned to date, work in progress and estimate to complete, but it also allows Project Managers to assign and resource load our staff and projects. <br />STANDARD FORM 330 AND RESUMESSee the following pages for Standard Form 330s fol-lowed by CGA's team resumes. <br />LICENSES AND CERTIFICATIONSCGA and its staff are appropriate licensed to perform the work outlined under this contract. CGA is certified to do business in the State of Florida. A copy of this certification is included in Tab G. A copy of CGA's pro-fessional licensure is provided on the following pages. <br />16
The URL can be used to link to this page
Your browser does not support the video tag.