<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm This traffic impact study evaluated the anticipated traffic impacts within a downtown Miami area for a proposed mixed-use development. The site features offices, apartments, restaurants, retail and a parking garage. The analysis included data collection, trip generation and distribution, forecasted future volumes and a traffic signal warrant analysis. In addition, Consultant looked at other approved project traffic within a one-mile radius of the project to better predict the future capacity of the surrounding roadways. Synchro capacity analysis software was used to evaluate traffic operations and followed MUTCD guidelines for the traffic signal warrant analysis.
<br />h.
<br />(1) TITLE AND LOCATION (City and State)
<br />Florida Department of Transportation (FDOT) District 6
<br />Biscayne Boulevard (NE 5th Street to NE 13th Street)
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (if applicable) 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm In order to continue the enhancements of the US 1 Corridor for the City of Miami, Consultant developed a streetscape design to unify the area surrounding the American Airlines Arena, Bicentennial Park and the Performing Arts Center. Enhancement of the pedestrian corridor and integration with the existing Roberto Burle Marx paving design, directly to the south, was integral in the design of the project. Coordinated with the City of Miami during the design process, participated in numerous public involvement and design meetings, and incorporated access management concepts, including limited vehicular access and multi-modal transportation. Improvements included specialty paving and lighting elements. This project was part of a multi-year continuing service contract with FDOT District 6.
<br />i.
<br />(1) TITLE AND LOCATION (City and State)
<br />Downtown Boca Raton Traffic Study
<br />Boca Raton, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager and Traffic Engineer for the preparation of a traffic study at the intersection of Palmetto Park Road and NE/SE 5th Avenue which examined the safety and the operation of the intersection of Palmetto Park Road and NE/SE 5th Avenue and seven other surrounding intersections and enumerated at least three viable improvement concept plans. The alternative analysis included quantitative and qualitative elements such as Safety, Context Sensitivity, Capacity, Benefit Cost and Fatal Flaw analysis as well as the evaluation of bridge preemption and signal coordination with the subject intersection. Professional Fees: $50,000.
<br />j.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Key West ULDR Update and Complete Streets Manual
<br />Key West,Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Traffic Engineer for complete rewrite of the City’s Land Development Regulations. The key areas of focus for the project included the incorporation of new standards, programs, and processes related to Complete Streets, Parking, Transportation Demand Management, Affordable Workforce Housing, Signage, Landscape, Urban Design, Green Building and Adaptation Planning and Disaster Planning. Professional Fees: $143,700.
<br />k.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of West Palm Beach Traffic Engineering Continuing
<br />Services Contract, West Palm Beach, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager on this Continuing Services Contract serving as Engineer of Record for task work orders. Provided a variety of traffic and transportation consulting services to the City of West Palm Beach including intersection studies, corridor studies, traffic concurrency studies, traffic calming design, pavement analysis, pavement evaluation study, signing and marking plans, and evaluation of the comprehensive plan transportation element, just to name a few. CGA’s fees: $200,000.
<br />l. (1) TITLE AND LOCATION (City and State)
<br />Town Traffic Engineer Services
<br />Surfside, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) N/A
<br />33
|