|
AUTHORIZED FOR LOCAL REPRODUCTION
<br />(1/2004)
<br />MANDATORY USE DATE OF FORM 6/2004
<br />STANDARD FORM 330
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.) 12 NAME
<br />GIANNO FEOLI 13 ROLE IN THIS CONTRACT
<br />LANDSCAPE URBANIST 14. YEARS EXPERIENCE a TOTAL
<br />23 b WITH CURRENT FIRM
<br />12 15 FIRM NAME AND LOCATION (City and State)
<br />CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA 16 EDUCATION (DEGREE AND SPECIALIZATION)
<br />Master of Landscape Architecture, Florida International
<br />University, School of Architecture, Miami, Florida
<br />B.A., Architectural Studies, Florida International University,
<br />School of Architecture, Miami, Florida
<br />17 CURRENT PROFESSIONAL REGISTRATION
<br />(STATE AND DISCIPLINE)
<br />18 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Feoli leads the Landscape Department in creative design strategies for urban environments with specialties including urban design, contextual analysis and branding. He will contribute his experience in providing detailed site design, large- scale redevelopment planning, and graphic communication services. His experience has encompassed a wide array of project-types, and his strengths lie in park design, streetscapes and urban redevelopment, and form-based urban designs and planning strategies.
<br /> 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Middle Beach Recreational Corridor
<br />Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (if applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Lead Designer: responsible for coordinating all engineering and environmental efforts associated this 2- mile long linear multi-use trail project on State- owned lands, as well as responsible for all planting and hardscape design and public outreach. Conducted one-on-one meetings with over 39 condominium properties to gather support for the project, responded to residents’ concerns, and addressed design restrictions set forth in the Florida Administrative Code and balance those against resident's expectations. Responsible for coordinating with all State and local permitting agencies CGA’s fees: $534,000.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Oakland Park Station
<br />Oakland Park, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (if applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Responsible for all conceptual design, site, design and construction detailing of a public plaza at the terminus of the City's culinary district. The design effectively created flexible public environment that could be used as event spaces and could accommodate the needs of the City in continuing its adopted branding through the use of elements, furnishings, paver palettes and landscape lighting. The project's challenging shallow dimensions required innovative solutions to address ADA access to adjacent buildings while maximizing opportunities for the use of space, addressed through the creation of large stage settings that served as landings and allowed for public engagement and interaction. CGA’s fees: $25,000.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />98th Street Park
<br />Bay Harbor Islands, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (if applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Responsible for all public outreach, site design, construction detailing, and planting design of a neighborhood passive park. The park includes a small dog park area, flexible open space, children's play areas, an interactive water feature and a restroom facility. Designed the splash pad, play areas, and landscaping. Coordinated the design of the restroom facility and facilitated all necessary public outreach through both the Parks and Recreation Committee and the Town Council. CGA’s fees: $42,000.
<br />37
|