My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Label each document PROJECT RECORD in 2 inch printed letters <br />followed by the Contractor's name and address and the signature of the <br />Contractor's authorized representative. No Record Documents will be <br />accepted from Subcontractors. <br />D. Submit completed Record Documents to the Engineer prior to or in <br />conjunction with request for Substantial Completion. Prior to final <br />payment, revise Record Documents to show additional information, <br />construction and changes and resubmit to the Engineer. <br />1.09 TESTING <br />A. The Contractor shall obtain the services of a professional testing <br />laboratory approved by the Engineer to perform the following type of tests <br />and test frequencies. Copies of all reports are to be sent to the Engineer <br />as soon as possible. <br />B. Density tests for trench backfill at the rate of three tests per lift in 1,000 <br />feet of trench. <br />C. Density tests for subgrade compaction at the rate of three test in 1,000 <br />feet of roadway. <br />D. Density tests for limerock base at the rate of three tests per day on each <br />course of completed compacted base. <br />E. Density tests for roadway crossings at the rate of one test per lane per lift <br />of compacted material, beginning one foot above the normal water table. <br />F. If in the opinion of the Engineer, suitable compaction has not been <br />achieved around structures, density tests may be required. <br />G. Concrete compressive strength at the rate of three cylinders per the lesser <br />of 50 cubic yards or per day. <br />H. Should the above test results indicate deficiencies, the Engineer may <br />order additional tests at the Contractor's expense, and all reworked areas <br />shall be retested at the Contractor's expense. <br />Testing in the County right -of -way shall meet the requirements of Broward <br />County's "Minimum Standards ". <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION <br />December 2006 01015 -5 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.