My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.11 EQUIPMENT, TESTING & INSPECTION <br />A. Regardless of the number of days specified in the individual sections for the <br />manufacturers representative to be present on the site for inspection and <br />testing, if the equipment fails to perform as specified then the representative <br />shall remain on site until the malfunction is corrected and the Owner <br />received specified days of inspection or testing. <br />B. The cost for the additional days required shall not be added to the cost of <br />the Owner, but shall be to the account of the Contractor. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION <br />December 2006 01030 -4 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.