My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IPART PRODUCTS <br />2.01 TREE PROTECTION FENCING <br />A. Tree protection fencing shall be: <br />1. Mesh fence 6 ft. high minimum, with 4 "x4 "x6' pressure treated <br />wood posts. <br />B. Posts shall be spaced 1 Oft. o.c. maximum. <br />C. Fencing other than that specified above shall be subject to the approval of <br />the Architect. <br />PART 3 EXECUTION <br />3.01 INSTALLATION OF FENCING <br />A. Prior to start of demolition work and clearing and grubbing operations, tree <br />protection fencing shall be installed in accordance with the following: <br />1. Fencing shall be installed at the tree protection areas as directed <br />by the Landscape Architect. <br />2. Fencing shall be located along the cut and fill lines staked by the <br />project surveyor and approved by the Architect and Owner. <br />3.02 ROOT PRUNING <br />A. Where construction will be in close proximity to existing trees designated <br />' to remain, roots shall be pruned. Proximity shall be as determined in the <br />field by the Architect. Root pruning shall be performed as specified in <br />Section 02490 TREES, PLANTS AND GROUND COVERS. <br />3.03 CLEARING WITHIN PROTECTION AREAS <br />A. Selective clearing within tree protection areas shall only be performed <br />when and as directed by the Architect. <br />3.04 REMOVAL OF PROTECTION <br />A. Except as otherwise indicated or requested by Architect, temporary <br />protection devices and facilities installed during course of the work shall <br />be removed only after all work which may injure or damage trees and <br />plants is completed. <br />END OF SECTION <br />December 2006 01532 -2 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.