My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />t <br />r <br />PARTI- GENERAL <br />1.01 <br />1.02 <br />SECTION 01550 <br />SITE ACCESS AND STORAGE <br />HIGHWAY LIMITATIONS <br />A. The Contractor shall make his own investigation of the condition of available <br />public and private roads and of clearances, restrictions, bridge load limits, <br />and other limitations affecting transportation and ingress and egress to the <br />site of the work. <br />TEMPORARY CROSSINGS <br />A. Temporary restoration shall be completed within five days of pipe <br />installation. Temporary restoration shall include all driveways, sidewalks <br />and roadways. They shall be swept clean and be maintained free of dirt <br />and dust. All areas disturbed by the construction activities shall be restored <br />to proper grade, cleaned up, including the removal of debris, trash, and <br />deleterious materials. All construction materials, supplies, or equipment, <br />including piles of debris shall be removed from the area. All temporarily <br />restored areas shall be maintained by the Contractor. These areas shall be <br />kept clean and neat, free of dust and dirt, until final restoration operations <br />are completed. The Contractor is responsible to utilize dust abatement <br />operations in the temporarily restored areas as required, to the satisfaction <br />of the Engineer. <br />B. Final restoration shall be completed within thirty days of pipe acceptance. <br />Final restoration shall include the completion of all required pavement <br />replacement of roadways, driveways, curbs, gutters, sidewalks and other <br />existing improvements disturbed by the construction; final grading, <br />placement of sod, pavement marking, etc., all complete and finished, <br />acceptable to the Engineer. <br />December 2006 <br />In order to obtain a satisfactory junction with adjacent surfaces, the <br />Contractor shall saw cut back and trim the edge so as to provide a clean, <br />sound, vertical joint before permanent replacement of an excavated or <br />damaged portion of pavement. Damaged edges of pavement along <br />excavations and elsewhere shall be trimmed back by saw cutting in straight <br />lines. All pavement restoration and other facilities restoration shall be <br />constructed to finish grades compatible with the adjacent undisturbed <br />pavement. <br />01550 -1 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.