My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-12-01) Town Center Park Restroom & Lighting Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:49:53 AM
Creation date
1/24/2011 10:45:37 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Restrooms & Lighting Improv.
Bid No. (xx-xx-xx)
06-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 2006 <br />01600 -2 06 -5723 <br />1.03 APPROVAL OF MATERIALS <br />A. <br />Only new materials and equipment shall be incorporated in the work. All <br />' <br />materials and equipment furnished by the Contractor shall be subject to the <br />inspection and approval of the Engineer. No material shall be delivered to <br />the work without prior approval of the Engineer. <br />B. <br />Within 30 days after the effective date of the e Agreement, the Contractor <br />shall submit to the Engineer, data relating to materials and equipment he <br />proposes to furnish for the work. Such data shall be in sufficient detail to <br />enable the Engineer to identify the particular product and to form an opinion <br />as to its conformity to the specifications. The data shall comply with <br />Paragraph 1.07 of this Section. <br />C. <br />Facilities and labor for handling and inspection of all materials and <br />equipment shall be furnished by the Contractor. <br />If the Engineer requires, <br />either prior to beginning or during progress of the work, the Contractor shall <br />submit samples of materials for such special tests as may be necessary to <br />demonstrate that they conform to the specifications. Such samples shall be <br />furnished, stored, packed, and shipped as directed at the Contractor's <br />' <br />expense. Except as otherwise noted, the Owner will make arrangements <br />for and pay for the tests. <br />D. <br />The Contractor shall submit data and samples sufficiently early to permit <br />consideration and approval before materials are necessary for incorporation <br />in the work. Any delay of approval resulting from the Contractor's failure to <br />submit samples or data promptly shall not be used as a basis of claim <br />against the Owner or the Engineer. <br />E. <br />In order to demonstrate the proficiency of workmen or to facilitate the <br />choice among several textures, types, finishes, and surfaces, the Contractor <br />shall provide such samples of workmanship or finish as may be required. <br />F. <br />The materials and equipment used on the work shall correspond to the <br />approved samples or other data. <br />1.04 MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION <br />' <br />A. <br />When Contract Documents require that installation of work shall comply <br />with manufacturer's printed instruction, obtain and distribute copies of such <br />instructions to parties involved in the installation, including copies to the <br />Engineer. <br />1. Maintain one set of complete instructions at the job site during <br />installation and until completion. <br />December 2006 <br />01600 -2 06 -5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.